Communication Telecom Antenna Tower Network Construction Angle Steel
Outdoor 5G Telecom Microwave Antenna Galvanized 4-Legged Angular Steel Tower
Self supporting tower usually is 3-leg of 4-leg tower, and its material is steel pipe or angle steel. As for the connection, tubular tower is connected by flange, and angle steel tower is connected by nuts and bolts.
Features:
2. Save land resource, convenient location.
3. Convenient transportation and installation.
| Communication tower | ||
| 1. Design Code | AST-101 | |
| Structure Steel | ||
| 2. Grade | Mild Steel | High Tensile Steel |
| GB/T 700:Q235B | GB/T1591:Q345B | |
| ASTM A36 | ASTM A572 Gr50 | |
| EN10025: S235JR | EN10025: S355JR | |
| 3. Design Wind Speed | 0-300KM/H | |
| 4. Allowable deflection | 0.5 ~1.0 degree at operational speed | |
| 5. Tension strength (Mpa) | 360~510 | 470~630 |
| 6. Yield strength (t≤16mm) (Mpa) | 355 | 235 |
| 7. Elongation (%) | 20 | 24 |
| Bolts & Nuts | ||
| 8. Grade | Grade 4.8, 6.8, 8.8 | |
| 10. Standards for mechanical properties | ||
| 10.1 Bolts | ISO 898-1 | |
| 10.2 Nuts | ISO 898-2 | |
| 10.3 Washers | ISO 6507-1 | |
| 12. Standard | AWS D1.1 | |
| Galvanizing | ||
| 14. Galvanization standard of steel sections | ISO 1461 or ASTM A123 | |
| 15. Galvanization standard of bolts and nuts | ISO 1461 or ASTM A153 | |
Price Term: EXW, FOB, CFR or CIF and so on
Shipping port: Tianjin port
Payment Term: Usually 50% by T/T as deposit balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.
Delivery Time: Usually 30-45 days after PO/drawing/prepayment confirmed.
Package: Normally we use steel wire to make the angle into bundle ,then use special material to protect the zinc, or according to client’s requirement.
Please provide drawings if you have so that we can calculate the accurate price for you.
We also provide design according to your requests, if you don't have drawings.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
