Hot Dipped Galvanized Flood Defence Barriers Mil 7 Defensive Barrier
Hot Dipped Galvanized Welded Flood Barrier Mil 7 Military Defensive Barrier
Defensive Barrier Descripition:
The hesco barrier is manufactured from welded zinc-aluminum coated steel wire mesh and jointed with vertical, helical-coil joints.The units are lined with a heavy-duty non-woven polypropylene geotextile. When jioned and filled, the system can be used to create of exceptional strength and structural integrity.
Installation:
1, Ends, diaphragms, front and back panels are placed upright on the bottom section of wire mesh.
2, Secure panels by screwing spiral binders through the mesh openings in adjacent panels.
3, Stiffeners shall be placed across the corners, at 300mm from the corner. Providing a diagonal bracing, and crimped over the line and cross wires on the front and side faces. None are needed in interior cells.
4, Gabion box filled with graded stone by hand or with a shovel.
5, After filling, close the lid and secure with spiral binders at the diaphragms, ends, front and back.
6, When stacking tiers of the welded gabion box, the lid of the lower tier may serve as the base of the upper tier. Secure with spiral binders and add pre-formed stiffeners to exterior cells before filling with graded stones,.
Defensive Barrier Specification:
| Unit Type | Height | Width | Length | Internal Cells |
| ZERUN-1 | 1.37m/4' 6" | 1.06m/3' 6" | 10m/32' | 9cells(4+5) |
| ZERUN-2 | 0.61m/2' | 0.61m/2' | 1.22m/4' | 2cells |
| ZERUN-3 | 1.0m/3' 3" | 1.0m/3' 3" | 10m/32' | 10cells(5x2) |
| ZERUN-4 | 1.0m/3 '3" | 1.5m/5' | 10m/32' | 10cells(5x2) |
| ZERUN-5 | 0.61m/2' | 0.61m/2' | 3.05m/10' | 5cells(5x1) |
| ZERUN-6 | 1.68m/5' 6" | 0.61m/2' | 3.05m/10' | 5cells(5x1) |
| ZERUN-7 | 2.21m/7' 3" | 2.13m/7' | 27.74m/90' | 13cells(4+4+5) |
| ZERUN-8 | 1.37m/4' 6" | 1.22m/4' | 10m/32' | 9cells(4+5) |
| ZERUN-9 | 1.0m/3' 3" | 0.76m/2' 6" | 9.14m/30' | 12cells(6x2) |
| ZERUN-10 | 2.12m/7' | 1.52m/5' | 30.5m/95' | 20cells(5x4) |
| ZERUN-11 | 2.74m/9' | 1.06m/3' 6" | 3.3m/11' 3" | 3cells(3x1) |
| ZERUN-12 | 2.1m/7' | 1.06m/3' 6" | 33m/108' | 30cells(5x6) |
| ZERUN MILITARY DEFENSIVE BARRIER | ||||
Defensive Barrier Process:
Booking the galfan or hot dipped galvniazed wire
material wire zinc coating test
welding wire mesh
Assemble gabion box
Stamp cloth
package and loading
Defensive Barrier Quality Control Process
Galfan wire or hot dipped galvanized test the Zn/Ai coating
Semi-finished product test the hole size and panel size
Finished Product’s installation
ZERUN SERVICE :
We can provide most of free samples .
We have been in providing the professional products in wire mesh fence field for 15 years.
We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
If there are some defective items, we usually credit to our customer or replace in next shipment.
payment term:
T/T,30% in advance and the balance 70% against the copy of B/L.
Other payment term we can discuss.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.