Zhejiang Babysun New Energy Technology Co., Ltd.
                                                                                                           
Verified Supplier
19 Years
Since 2007
Menu

Tenon Bending Water Heater Machine Manual 0.31mm 0.50mm Thickness

Price Negotiable
Price: USD800.00-16000.00/set
MOQ: 1
Delivery Time: 21-28 Workdays
Brand: BABYSUN/OEM
Product Description

Solar Water Heater Tenon Bending Machine

Out tank solar water heater tenon bending machine solar water heater machinery

SZ-3000 Out Tank Tenon Bending Machine (Manual)

Product: solar water heater tenon bending machine

Application of solar water heater tenon bending machine: The outer tank connecting edge tenon bending.

Description: Manual bending. The solar water heater tenon bending machine is made of large channel steel and use wear-proof blade, sheet is positioned by inserting.

Parameter of solar water heater tenon bending machine:

Tenon Bending Width 5.0mm
Max. Processing Thickness 0.5mm
Max. Effective Length 3000mm
Max. Efficiency 150pcs/per 8 hour
Weight 200kg
Size (L*W*H mm) 3000*620*1100

Solar water heater production machine

(1) Time of Shipment: Effect shipment will be around 75-90 days after receiving the 30% advance payment.

(2) Terms of payment: TT at sight (pay 30% advance payment by TT before production, the rest 70% must be paid after seeing the copy of BL by TT).

(3)Acceptance Certficate: The machine acceptance test will be made in the sellers factory at the presence of the buyers technicians for the production. Once the quotation standards reached an acceptance certificate will be signed by both parties and the machine shall be considered accepted.

(4) Guarantee Period: In correct operation&maintaing, the machine is guaranteed for one year from the date of BL date. During the guarantee, it is free for spare parts; after the guarantee, you have to buy new parts if the spare parts are broken. All the machines are piovided with whole-life service.

(5)Installation&Training (Optional)
After the machines arrived at destination, the seller will send 1 technician to the buyers factory to install the machines and trainning the workers at the buyer 's written request.
Installation and trainning period: 7 working days.
The buyer needs provide some technicians to assist the work, solve the language problem of the technicians of the seller. Before installation, the buyer should prepare coil sheet and hydraulic oil and the foundation for positioning the machine.
Installation labor charge: 150USD/DAY
In addition the buyer pays seller's technicians travel cost outside china (including roundflight fee), accommodation and foods(at least three-star hotel with air condition), provide transportation from hotel to the work place. necessary communicaton and insurance etc.
The buyer should pay the above fee in advance.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Zhejiang Babysun New Energy Technology Co., Ltd.
Location No.4 Factory, No.16 Jinshi Road, Jianshan New District, Haining, Jiaxing City, Zhejiang Province, China
Contact Person James Cao

Request A Quote

Please check your email address.
Your message must be at least 20 characters.