Co2 Laser Engraving Cutting Machine 20m/Min For MDF
CE Approved 150W CNC Laser Engraving Cutting Machine For Acrylic
Application:
| No. | Content | V8 | Remark | |
| 1 | Wire Rod | Ball screw | Imported | |
| 2 | Drive Motor | The X axis drive motor | 0.85KW | Yaskawa Japan or Germany Siemens |
| The Y axis drive motor | 1.3KW | |||
| The Z axis drive motor | 0.85KW | |||
| 3 | CNC System |
Independent electrical control box and a handwheel | WEIHONG or SIEMENS | Selection type |
| 4 | Working Area | Working area (mm) | 1220*2440 | |
| Working area | Grid vacuum adsorption | |||
| 5 | Line Slot | Imported high quality wire groove | KSS | Taiwan |
| 6 | Cable | Flexible cable | IGUS | Germany |
Optional:
2, import RF laser.
3, metal and nonmetal mixed cutting (2mm steel plate).
4, automatic edge alignment cutting.
5, air purifier.
Guarantee & After-sale service:
2. 24 hours technical support by Phone, Email, Skype, Msn, or romote.
3. Free training to make sure you master the operation of machine .
OEM Service Available:
2. working size could be custmer-oriented designing.
3. Special configuration and machine color could be customer-oriented designing.
Company Profile
FAQ:
A. Question: What kind of our company is KINDLYTECHLASER?
Re: KINDLYTECH is laser cutting machines, laser welding machines, laser marking machines manufacturing expert since year 2001.
B. Question: How is co2 laser cutting machine guarantee?
Re: b1.co2 laser cutting machine warrenty period is 12 months after BL time;
b2.12 hours technical support feedback;
b3. Own machining factory, which can control the spare parts quality at high quality;
b4. Own accessories warehouse and user can enjoy the agent price.
C.Question: How is delivery time?
Re: We can delivery the machines within 7 days if we have the machines in stock.
The common machine fabricating time is 15-25 days and CNC machine fabricating time is about 25-50 days.If you have customized products, the delivery time will be given after confirmation.
D. Question: How is payment?
Re: 50% of amount as deposit and the balance should be paid by T/T or LC at sight before seller delivery the machines to loading port.
E.Question: How is our package?
Re: Wooden Pallet/ Wooden Case. In order to ensure high quality products precision, the perfect package is necessary.
F. Question: Why is price higher than other supplier?
Re: f1. We have our own machining factory and the high quality technical quality is our aim;
f2. All the electric parts and pneumatic parts are high quality. Most of them are imported from european and american market;
f3. Most of fabricating worker has more than 10 years working time. Their fabricating work is professional and salary is higher;
f4. Our warrenty period is 12 months after BL time. It can support the new comer client going well in the beginning time.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.










