Guangzhou Opal Machinery Parts Operation Department
                                                                                                           
Verified Supplier
21 Years
Since 2005
Menu

232-15-19270 2321519270 High Quality Seal Ring D21A-8 D21A-7

Price Negotiable
Price: Negotiable
MOQ: 10
Delivery Time: Within 5-15 days after getting your desposit
Brand: OUB
Product Description

1. Quick Details of  seal 232-15-19270:

Part NO. 232-15-19270
Machine Crawler Dozer
Size OEM
Material  Glass-Filled PTFE
Type GASKET

 

2. 232-15-19270  parts on group :

NO. PART NO. PRAT NAME QTY
1 103-15-41010 TRANSMISSION ASSEMBLY,(FOR MONO LEVER STEERING) 1
2 103-15-00630 HOUSING ASSEMBLY,1ST 1
3 07043-70108 PLUG 2
4 362-15-12750 PISTON,1ST 1
5 232-15-19270 RING,SEAL (K1) 1
6 362-15-19220 RING,SEAL (K1) 1
7 07011-10050 SEAL 1
8 06001-06008 BEARING 1
9 07018-01004 RING 1
10 07000-05240 O-RING (K1) 1
11 04065-06825 RING 1
12 362-15-12720 PLATE 1
13 362-15-12720 PLATE 1
14 362-15-12730 PLATE 11
15 103-15-32711 DISC 11
16 145-14-12790 SPRING, (L= 59.0) 5
17 113-15-21290 PIN 2
18 103-15-31150 PLATE 1

 

3.232-15-19270 picture:


4. Service part number :

PART NO. PART NO. Part NO.
707-35-52660 707-51-80630 707-51-70030
707-35-52670 707-51-80640 707-98-25830
707-51-85640 707-51-11640 707-98-25870
707-51-85650 707-51-11650 707-98-25910
707-51-90630 707-51-11690 707-98-25920
707-51-90640 707-51-12630 707-98-25970
707-51-90650 707-51-12640 707-98-25980
707-51-95630 707-51-12650 707-98-26070
707-51-95640 707-44-10911 707-98-26100
707-51-95650 707-44-11080 707-98-26110
421-63-H0P12 707-44-11150 707-98-26120
707-51-10630 707-44-11180 707-98-26200
707-51-10640 707-44-11250 707-98-26300
707-51-10650 707-98-60120 707-98-26441
707-99-77240 707-98-60121 707-98-26450

 

5. FAQ

Q: Does the komatsu transmission installation is high cost?

A: The answer is yes.the Komatsu transmission installation is very expensive (high cost), especially for excavators/heavy machinery.Why So High?one is Komatsu OEM parts are premium-priced,second is Heavy machinery requires specialized tools & technicians,The third is Long labor time,about 10–20 hours vs 6–12 for cars.The final is Additional parts: seals, gaskets, fluid, filters.There are other details that may be encountered during the repair process, and these need to be assessed based on the actual situation


Q: How do I install this gasket correctly?

A: Clean both mating surfaces thoroughly to remove all oil, dirt, or old gasket residue, align the new gasket precisely with fluid ports and bolt holes, then tighten fasteners evenly in a crisscross pattern to ensure uniform pressure distribution.


Q: What common factors lead to gasket failure?

A: The most frequent causes are poor surface preparation, uneven bolt torque, using the wrong gasket material for the application, and reusing previously compressed gaskets.


Q: How long can a properly installed PTFE gasket last?

A: With clean surfaces and correct torque, a PTFE gasket can last for years of continuous service; it only needs replacement when the joint is disassembled for maintenance.


Q: Can I reuse a used gasket?A: No, you should never reuse a gasket. Once compressed, the material forms a permanent compression set and will not re-seat properly, even if it appears undamaged. Always install a new gasket when reassembling the joint.

6. Exhibition and Wearhous

14X-13-05110  14X1305110 SERVICE KIT,TORQUE CONVERTER FOR KOMATSU D65EX-12E,D65A-12 1

14X-13-05110  14X1305110 SERVICE KIT,TORQUE CONVERTER FOR KOMATSU D65EX-12E,D65A-12 2

 

14X-13-05110  14X1305110 SERVICE KIT,TORQUE CONVERTER FOR KOMATSU D65EX-12E,D65A-12 3

 

Oil seals,Hydraulic Seals, Cylinders Seal Kits, And More

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Opal Machinery Parts Operation Department
Location NO.212,Zhu ji rode,tian he distric,guangzhou,China
Contact Person Vivian

Request A Quote

Please check your email address.
Your message must be at least 20 characters.