Grey Iron Hollow Investment Casting Parts RoHS CA65 Certificated
Grey Iron Investment Casting Hollow Parts For Auto Parts With RoHS
Manufacturing Process:
Process design⇒ Tooling making ⇒ Wax injection ⇒Wax pattern assembly⇒ Mold preheat ⇒ Wax removal ⇒Stuccoing ⇒Dipping Casting⇒ Mold shake out ⇒Work piece cut-off ⇒ Grinding ⇒ Pack& transport ⇒ Final inspection ⇒Machining ⇒ Heat treatment
Specifications:
| 1) Material: | Brass/ Red Copper/ Copper Alloy, Titanium Alloy, Magnesium Alloy, Zinc Alloy, Stainless Steel, Aluminum Alloy, Plastic Parts, Gray Iron/ Magnesium Iron/ Cast Aluminium, Die Steel/ Tooling Steel/ Special Steel etc. or material you are specifying |
| 2) Finish: | Zinc plating, Anodization, Chemical fim, Powder, Passivation, Sand blasting, Brushing & ploshing etc or as your requirements |
| 3) Our services: | CNC Machining center,CNC turning, CNC turning and milling compound processing, 3/4/5 axis CNC milling, Casting,Roll mill,wire-cutting, EDM, griding,CNC cutting,laser cutting service,stamping,bending and cutting, etc. |
| 4) Drawing format: | pdf/.dwg/.igs./.stp/x_t. etc |
| 5) Terms of trade: | EXW, FOB, CIF,D2D |
| 6) Terms of payment: | T/T, Western Union, L/C, Paypal |
| 7) Packing: | Eco-packaging: EPE Foam, Carton, Wooden boxes, and other tailor-made packing per customer's requirement |
| 8) Inspection | Complete inspection lab with Micrometer, Optical Comparator, Caliper Vernier, Depth Caliper Vernier, Universal Protractor, Clock Gauge, Internal Centigrade Gauge |
Product Advantages:
Nickel-copper alloy has good room temperature mechanical properties and high temperature strength, high corrosion resistance, easy processing, good wear resistance, and is widely used in parts with wear resistance requirements
Lead time:
| Quantity(Pieces) | 1 - 1500 | >1500 |
| Est. Time(days) | 15 |
To be negotiated |
Quality assurance
- Every production process has a special person to test to ensure quality
- Have professional engineers to check the quality
- All products have passed CE, FCC, ROHS and other certifications
Customer Service:
- Free 3D construction service for simple parts
- Professional engineering support for your new project before manufacturing.
- Professional DFM report before placing the order
- Fast feedback, we are always online!
- Fast quote, all the quote will be done in 12 hours.
- Best quality
- Short delivery time, CNC can be done in 3 days, molding can be done in 15 days.
- Affordable invest to your new project
FAQ:
Q: Are you professional investment casting supplier?
A: Yes, we are professional investment casting supplier with more than 20 years experience. We export the investment casting parts to USA, Germany, England, Italy, France, Norway etc.
Q: Can I have a trial order only for several pieces?
A: Of Course, we can deliver the goods via express.
Q: How long is your delivery time?
A: 10-15 days for the mould then about 10-20 days for the production.
Q: Do you provide samples? Is it free or extra?
A: It's up to your product, if no need open the mould then we can offfer you one free sample, if need to open the mould, then you need to pay for the mould and we can offer you the free sample.
Q: What is your terms of payment?
A: TT, OR L/C(For big order ), Western Union, Paypal, Moneygram.
Q: Are you gold supplier and do trade assurance?
A: Definitely!
Packing:
Whatever you need, we can meet your demand!
Shipping:
Up to customer
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.