3tech corporate limited
                                                                                                           
Verified Supplier
28 Years
Since 1998
Menu

Container Dimension Data Center , DCIM Modular Data Center Construction

Price Negotiable
Price: negotiate
MOQ: negotiate
Delivery Time: negotiate
Brand: LionRock
Product Description

Container Dimensions Data Center , DCIM Modular Data Center Construction

Power Module1

The power module is a single ISO40HC container with four levels of power capacity that can be upgraded from the basic configuration to
480kW ICT load capacity in steps of 120kW each. Internal arrangement has been designed to allow the upgrade by installing additional power
equipment. Multiple Power Modules can be combined to support even high ICT load.

 

ICT Module1

Two ICT module designs are available to suit different cabinet depth. They can be combined in different configurations to meet various
operation requirements. Expansion is easy just by adding more modules. Combined with the Power module, there is always a configuration
that meet your requirement.

 

General Specifications

Fire Protection Type Automatic fire detection (smoke and heat) with
gas suppression system (HFC-227ea)
Monitoring and
Management
Access Control Electronic lock with IC card reader
Monitoring Video: Infrared IP cameras
Data: PDF, UPS, DC, A/C, Temp & Hum, fire protection, access control and ventilation
HMI Touch screen
Remote Access Web, App
Notification SMS, email
DCIM OwlEye
Structure Container Dimensions (W x D x H): mm 12192 x 2438 x 2896 (ISO40HC)
Container Weight (Fully Equipped): T <25
Protection Level IP552
Environmental
Conditions
Working / Storage Temperature: °C -20 to 453 / -40 to 70
Humidity: % 5 to 95
Altitude: m ≤4000 (derating start >1000)
Corrosion Class C (500m away from seashore)

 

Notes:

1 - Consult 3Tech for customized versions with Tier 3 reliability level or different ICT design load.

2 - Optional IP65 protection level.
3 - Optional maximum temperature up to 55°C.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company 3tech corporate limited
Location (Headquarter) Room 09, 12/F., Tower B, Hunghom Commercial Centre, 37 Ma Tau Wai Road, Hung Hom, Kowloon, Hong Kong.
Contact Person 3Tech

Request A Quote

Please check your email address.
Your message must be at least 20 characters.