UNS N06600 N06601 Seamless Boiler Tubes Nickel Alloy Cladding

Price Negotiable
Price: Negotiable
MOQ: 100 tons
Delivery Time: Within 60 days after receiving the DP or L/C at sight
Brand: CHEONNY
Product Description

 

UNS N06600 N06601 Nickel Alloy Cladding Boiler Tube For Power Station Long Lifetime

 

Production Information of Cladding Boiler Tube


Surfacing welding is a welding process in which a layer of wear-resistant, corrosion-resistant and heat-resistant metal layer is deposited on the surface or edge of the workpiece, and the metal is melted by electric welding or gas welding and stacked on the tool or machine parts

 

Material
Nickel alloy steel / Cladding Boiler Tube
Grade
N02200, N02201, N08020, N08330, N08800, N08810, N08811, N08825, N06600, N06601, N06625, N06686, N06690, N04400, N10276, N06059
Spec.
B161/163, B165, B167, B407, B423, B444, B462, B514, B515, B516, B517, B535, B619, B622, B626, B704, B705, B729
O.D.
6~219MM
W.T.
0.50~25MM
Length
6 Meters or customized
Finish
Annealed & Picked or OD Mechanical Polish(up to 600#) or Bright Annealed & OD Polish
Tolerance
As per spec.
Application
Petroleum, chemical industry, chemical fiber, smelt, medical machinery, paper making, heat preservation and refrigeration, mechanical equipment, food, electricity, water conservancy, architecture, aerospace, navigation shipbuilding, environmental protection and boiler heat exchanger.
Package
Standard seaworthy package: 1.plywood case 2.wooden pallet package 3.bundle packageand other package or as customer request.
MOQ
500 kilograms
Supply Ability
500 tons/month
Port
Shanghai
Payment Term
T/T with 30% deposit, balance before shipment
Delivery Time
Usually within 30-60 days after payment

 

 

The most common problem in surfacing is cracking. The main methods to prevent cracking are as follows


1. Preheat before welding, control interlayer temperature and slow cooling after welding

2. Stress relief heat treatment after welding

3. Avoid multi-layer surfacing and use low hydrogen surfacing electrode

4. If necessary, build up the transition layer between the surfacing layer and the base metal (use the electrode with low carbon equivalent and high toughness)

Attention must be paid to butt welding:

1. According to the use requirements, reasonable selection of surfacing alloy

2. Reduce the dilution ratio of base metal as much as possible

3. Improve productivity

4. It is expected that the hardfacing metal and base metal have similar expansion coefficient and phase transformation temperature

 

Purpose of surfacing welding of Cladding Boielr Tube :


1. Reduce costs

2. Extend service life

3. Reduce maintenance

4. Reduce spare parts

 

Our Service


High-quality products supplier
Customized products
Flexible requirements for order size

Diverse products
Competitive price
Professional technical and quality team
Professional sales team

 

RFQ


 

Q: Are you trading company or manufacturer ?

A: We are manufacturer

 

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 25-35days if the goods are not in stock, it is according to quantity.

 

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample extra

 

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Cheonny Overlay Co., Ltd.
Location N0.1, Dongli Road, Donglai, Zhangjiagang City
Contact Person Hua Dong

Request A Quote

Please check your email address.
Your message must be at least 20 characters.