ISO Metal Sheet Forming Machine 5m/min For Floor Deck

Price Negotiable
Price: Negotiable
MOQ: 1set
Delivery Time: 25-50 work days
Brand: Gracias
Product Description

ISO Metal Sheet Forming Machine 5m/min For Floor Deck

The introduction of equipment

1

Suitable material

color steel sheet or galvanized sheet
2 Thickness of raw material 0.8-1.2mm
3 Uncoiler loading capacity 5000kg (can be increased to 10ton )
4 Working speed 12-15m/min
5 Voltage 380V,3phase,50Hz or as per customer’s requirements
6 Power requirement

Main motor power: 18.5KW (Depend on final design )

Hydraulic station power: 5.5KW (Depend on final design )

7 Controlling system Mitsubishi PLC & converter
8 Machine’s size about 28m*1.5m*1.6m (Depend on final design )

 

Technical specifications

Manual inner tight decoiler

a. coil inner diameter 450mm-550mm

b. maximum width of coiling 1200mm

c. maximum weight of loading 5000kg

 

Main forming machine

a. number of forming steps depend on the machine

b. material of shaft45# steel . Outer diameter90mm

c.main motor power3kw

d. The speed of forming:8-10/min

Hydraulic cutter

a. material of blade:Cr12 mould steel quenched treatment60-62

b. cutting system :adopt advanced hydraulic drive, after forming automatic cut,

no distort, no wasting , high safe factor.(main motor stop cutting)

 

The electrical control system

a. The Brand of display:Taida

b. The main computer (PLC):Tai Da DVP14

 

Hydraulic system

a. Adopting advanced hydraulic system of Tai Wan

b. Power:3kw

 

The equipments coating,package

a. the coating adopt international general shade-guide

b.The package :simple waterproof package.

 

The spare parts of the equipment

a. the element of easy damaging :contactor conk: 2 unit ,fuse: 4 set

b. the hydraulic sealing up cushion: 1set

c. Bolt spanner: 1 set

 

Note for use and maintenance

1) before use,you must check whether all connections are steady,whether bolts

and nuts are tightinstallation.when start the machine,you must make sure there

are enough lubrication oil in the case.

2) when start the machine commissioning,the machine should run idle,then

check it carefully such as noise,vibration and whether the oil window works

smoothly,whether every parts movement coordination.

3) You must cut off power when install the mould,move the motor belt and

big gear by hand,turn the workbench and make sure the slide up to the highest point.

 

Final products

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company WENZHOU YIHENG MACHINERY CO.,LTD
Location R2236 LUGANG DASHA LUCHENG ZONE WENZHOU CITY, ZHEJIANG CHINA.
Contact Person Sisi Zhang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.