Cangzhou Xingkui Pipeline Equipment Co.,Ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

ASME B16.9 A234 Wpb Forged Carbon Steel Pipe Elbow 1/2-72inch

Price Negotiable
Price: Negotiate
MOQ: 1 pc
Delivery Time: 3-10 Days
Brand: YiHang
Product Description

Astm B16.9 A 234 Wpb Forged Carbon Steel Pipe Elbow

Packaging & Delivery
Packaging Details
wooden cases, pallets or nude packing
Port
Tianjin Xingang

A234 WPB 90 degree long radius carbon steel pipe fittings elbow

 

Size 1/2"---72"
Wall Thickness

SCH10,SCH20,SCH30,STD,SCH40,SCH60,XS,SCH80,SCH100,SCH120,

SCH140,SCH160,XXS, DIN, JIS standard thickness

Standard

ASTMA234,ASTM A420,ANSI B16.9/B16.28/B16.25,ASME B16.9,

JIS B2311-1997/2312, JIS B2311/B2312, DIN 2605-1/2617/2615,

GB 12459—99,EN Standard etc.

Material

Q235, 20#, 10#, Q345

A234 WPB, WP5, WP9, WP11,

ST37.0, ST35.8, ST37.2, ST35.4/8, ST42, ST45, ST52, ST52.4

STP G38, STP G42, STPT42, STB42, STS42, STPT49, STS49

Application Low and middle pressure fluid pipeline,boiler, petroleum and natural gas industry,drilling,chemical industry, electric industry,shipbuilding,fertilizer equipment and pipeline, structure, petrochemical, pharmaceutical industry
Surface Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE, etc.
Package Plastic film,wooden cases ,wooden pallet,or on customers' request
Certificate ISO 9001:2008, SGS, BV, etc
Capacity 50,000 tons/year
Advantages

1.Reasonable price with excellent quality

2.Abundant stock and prompt delivery

3.Rich supply and export experience, sincere service

4.Reliable forwarder, 2-hour away from port.

 

What is the MOQ?

1piece elbow

Can I get a lower price if i order large quantities?

Yes,cheaper prices with more bigger size order

Can I have my own customized product?

Of course.We provide OEM services.The products' material ,dimensions ,color,etc. will according to requirements.

How long is the delivery time?

3-5 days if the goods are in stock. or it is 15-30 days if the goods are not in stock,according to quantity.

How about the quality gurantee period?

18 Months


Used to the pipes connecting ,

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Cangzhou Xingkui Pipeline Equipment Co.,Ltd
Location Cangzhou City ,Hebei Province,China
Contact Person Du

Request A Quote

Please check your email address.
Your message must be at least 20 characters.