Cangzhou Xingkui Pipeline Equipment Co.,Ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

Oil Gas Process A420 WPL6 Seamless Carbon Steel Cross Pipe Fitting OD15mm

Price Negotiable
Price: Negotiate
MOQ: 1 pc
Delivery Time: 3-10 Days
Brand: YiHang
Product Description

Oil And Gas Process Seamless A 105 Carbon Steel cross

Product Description:

 

Material: Carbon Steel: ASTM/ASME A234 WPB/WPC; A420 WPL6; ASTM A860 WPHY42/52 /60/65/70/75, ST37.0, ST35.8, ST45.8, 10CRMo910, 15CrMo, 12Cr1MoV,etc;
Alloy Steel: A234 WP1/WP2/WP5/WP9/WP11/WP12/WP22/WP91, etc;
Stainless Steel: A403 WP304/304L; WP316/316L/316H;WP347H,etc.
Standard: ASTM/JIS/DIN/BS/GB
ASME B16.9, ASME B16.28, MSS SP43, DIN2605,DIN2617,DIN2516,JISB2311,etc; or design as the clients' requests;
Usage:Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

OD 15mm-6000mm
Pressure 150#-2500#, PN0.6-PN400, 5K-40K, API 2000-15000
Standard ANSI B16.5, EN1092-1, SABA1123, JIS B2220, DIN, GOST, UNI, AS2129, API 6A, etc.
Wall thickness

SCH5S, SCH10S, SCH10, SCH40S, STD, XS, XXS, SCH20, SCH30, SCH40, SCH60,

SCH80, SCH160, XXS and etc.

Material

Duplex stainless steel: UNS31803, SAF2205, UNS32205, UNS31500, UNS32750,

UNS32760, 1.4462, 1.4410, 1.4501 and etc.

Pipeline steel: A694 F42, A694F52, A694 F60, A694 F65, A694 F70, A694 F80 etc.

Nickel alloy: inconel600, inconel625, inconel690, incoloy800, incoloy 825, incoloy 800H,

C22, C-276, Monel400, Alloy20 etc.

Cr-Mo alloy: A182F11, A182F5, A182F22, A182F91, A182F9, 16mo3 etc.

Application

Petrochemical industy; avation and aerospace industry; pharmaceutical industry;

gas exhaust; power plant; ship buliding; water treament, etc.

Q1: What is your terms of payment?

A: 30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.

Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU

Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.

Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.

 

Used To:

 

Used to the pipes connecting ,

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

 

Advantages And Characteristics:

Manufacter supplis strightly , of good quality and big quantity .

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etcUsed to the pipes connecting 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Cangzhou Xingkui Pipeline Equipment Co.,Ltd
Location Cangzhou City ,Hebei Province,China
Contact Person Du

Request A Quote

Please check your email address.
Your message must be at least 20 characters.