Cangzhou Xingkui Pipeline Equipment Co.,Ltd
                                                                                                           
Verified Supplier
Years
Since
Menu

Weld Metal Carbon Steel 4 Way Cross Pipe Connector Fittings MSS SP75 Gr B

Price Negotiable
Price: Negotiate
MOQ: 1 pc
Delivery Time: 3-10 Days
Brand: YiHang
Product Description

Weld MSS SP75 ASTM A106 Gr B Metal Carbon Steel Cross four way

Product Description:

PRODUCTS

Elbows,reducers,pipe tees,bends,pipe caps

MATERIAL

Carbon steel,stainless steel,alloy steel

We can produce according to materials appointed by consumers.

STANDARD

ANSI,ASME,API5L,DIN,JIS,BS,GB

we can also produce according to drawing by customers.

WALL THICKNESS

Sch5-Sch160 XS XXS STD

Material: Carbon Steel: ASTM/ASME A234 WPB/WPC; A420 WPL6; ASTM A860 WPHY42/52 /60/65/70/75, ST37.0, ST35.8, ST45.8, 10CRMo910, 15CrMo, 12Cr1MoV,etc;
Standard: ASTM/JIS/DIN/BS/GB
ASME B16.9, ASME B16.28, MSS SP43, DIN2605,DIN2617,DIN2516,JISB2311,etc; or design as the clients' requests;
Usage:Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

OD 15mm-6000mm
Pressure 150#-2500#, PN0.6-PN400, 5K-40K, API 2000-15000
Standard ANSI B16.5, EN1092-1, SABA1123, JIS B2220, DIN, GOST, UNI, AS2129, API 6A, etc.
Wall thickness

SCH5S, SCH10S, SCH10, SCH40S, STD, XS, XXS, SCH20, SCH30, SCH40, SCH60,

SCH80, SCH160, XXS and etc.

Application

Petrochemical industy; avation and aerospace industry; pharmaceutical industry;

gas exhaust; power plant; ship buliding; water treament, etc.

Advantages Ready stock, faster delivery time; available in all sizes, customized; high quality

Q1: What is your terms of payment?

A: 30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.

Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU

Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.

Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.

Q5: Could you produce according to the samples?
A : Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.

 

Used To:

 

Used to the pipes connecting ,

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc

 

Advantages And Characteristics:

Manufacter supplis strightly , of good quality and big quantity .

Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etcUsed to the pipes connecting 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Cangzhou Xingkui Pipeline Equipment Co.,Ltd
Location Cangzhou City ,Hebei Province,China
Contact Person Du

Request A Quote

Please check your email address.
Your message must be at least 20 characters.