100x100cm Office Rubber Flooring , Fire Retardant Rubber Flooring
Price:
Negotiation
MOQ:
200SQM
Delivery Time:
5-10 days
Brand:
Yunyi
Product Description
Description
When planning a rubber floor, you can choose not only from different formats and thicknesses, but also from different textures and finishes:
Textures – Rubber products can be textured during the manufacturing process, allowing you to add depth and character to your rubber floor.
1. 100% pure vinyl wear layer
2. Glass fiber reinforced woven fiberglass inner layer
3. Reinforcement layer
4. Closed cell foaming buffer layer
Specification
Texture of material | High elastic polymer | |||
specification | 50cm*50cm,100cm*100cm | |||
Thickness | 15mm,20mm,25mm,30mm,35mm,40mm,45mm,50mm | |||
tensile strength | 1.65MPa | |||
elongation at break | 150% | |||
Fire rating | B2 B1 | |||
Chemical detection | SGS indoor formaldehyde,National Testing,Fireproof Testing | |||
Wear resistant layer | Double wear layer,Wear resistant layer 1.5mm thickness | |||
Density | Surface layer density:1200, bottom density:800 | |||
Impact absorption | 50% | |||
Anti-slip value | 60 | |||
Bottom | flat bottom & fluted bottom | |||
COLOR DESIGN
| classification | requirements | results | method | test Description | |
| General properties | color fastness to artificial light | 6 minimum blue wool scale ≥3 on grey scale | fulfilled | BS EN ISO105 B02:1992 | Color changes measured in response to changes in lighting |
| residual indentation | nominal thickness <2.5mm average value ≤0.2mm | fulfilled | BS EN433:1994 | product indentation measured from loads | |
| flexibility diameter of Mandel 20mm | no cracking ai 20mm | fulfilled | BS EN433:1994 | product measured for damage after bending | |
| stubbed cigarette | method A ≥ rating 3 | fulfilled | BS EN433:1998 | surface changes measured after exposure to stubbed cigarettes [method A]and spontaneous burning [method B] | |
| stubbed cigarette method A, vertical load [5±0.1]N | ≤250mm3 | 199mm3 | ISO 4649:1985 | measurement of product surface abrasion | |
| Hardness | ≥75 shore A | 89 | ISO 7619:1986 | measurement of product hardness | |
| dimensional stability | Tolerance allowed: ±0.4% | -0.02% | BS EN 434:1994 | dimensional changes measured after exposing the product to heat | |
| General properties | Chemical resistance | fulfilled | BS EN423 | External changes were measured after exposing samples to chemical for determining amounts of time and then washing | |
| slip resistance ramp test | R9 | DIN51130:1992 | slip resistance measured by directly walking on differently sloping ramps | ||
| General properties | Smoke density | ≤ds450 | fulfilled | ASTM e662 | the density of smoke resulting from the burning of the product measured |
| surface flammability | ≥0.45w/cm2 | ASTM e648 | radiant heat value required for ignition of the product measured to gauge surface flammability properties |

Product Description


Product Application

FAQ
Q1: Is your company a trading company or a factory?
A: We are a manufacturer, but a trading company sells the goods
A: We are a manufacturer, but a trading company sells the goods
Q2: How can I get a sample of required material for confirm the quality?
A: The product you see now is cut from our finished product, so you can know the quality of our production when you see the sample.
A: The product you see now is cut from our finished product, so you can know the quality of our production when you see the sample.
Q3: How is your sample charge?
A: For existing samples: free on charge when no more than 1 square meter. Express time will be 3 days. But you have to pay the freight.
A: For existing samples: free on charge when no more than 1 square meter. Express time will be 3 days. But you have to pay the freight.
Q4: How about your Minimum order quantity (MOQ)?
A: 200SQM.
A: 200SQM.
Q5: What’s the delivery time?
A: 5-10 days.
A: 5-10 days.
Q6: Can you help us to shorten the lead time? Because there is not enough time left for us to deliver the goods to our customer within the lead time.
A: In a way, yes, we can get our factories reschedule their production, as long as the lead time of our other customers are not affected.
A: In a way, yes, we can get our factories reschedule their production, as long as the lead time of our other customers are not affected.
Q7: What’s your terms of payment?
A: 30% in advance, the other 70% before shipment.
A: 30% in advance, the other 70% before shipment.
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shanghai Yunyi International Trade Co., Ltd
Location
352 Wenxiang Road, Songjiang District, Shanghai
Contact Person
Chen
