Office Eco Friendly Rubber Flooring
Price:
Negotiation
MOQ:
200SQM
Delivery Time:
5-10 days
Brand:
Yunyi
Product Description
Description
Rubber mat is a kind of high density, stable and durable rubber products. It's made from 100% recycled rubber and a new generation of environmentally binder. With the improvement of people's living standard, indoor and outdoor rubber flooring are more and more popular nowadays. And people all pay more attention on safety and environmentally-friendly of products. So our rubber tiles are made of 100% recycled rubber grains and not added any hazardous substances during the production process.
Specification
Texture of material | High elastic polymer | |||
specification | 50cm*50cm,100cm*100cm | |||
Thickness | 15mm,20mm,25mm,30mm,35mm,40mm,45mm,50mm | |||
tensile strength | 1.65MPa | |||
elongation at break | 150% | |||
Fire rating | B2 B1 | |||
Chemical detection | SGS indoor formaldehyde,National Testing,Fireproof Testing | |||
Wear resistant layer | Double wear layer,Wear resistant layer 1.5mm thickness | |||
Density | Surface layer density:1200, bottom density:800 | |||
Impact absorption | 50% | |||
Anti-slip value | 60 | |||
Bottom | flat bottom & fluted bottom | |||
COLOR DESIGN
| classification | requirements | results | method | test Description | |
| General properties | color fastness to artificial light | 6 minimum blue wool scale ≥3 on grey scale | fulfilled | BS EN ISO105 B02:1992 | Color changes measured in response to changes in lighting |
| residual indentation | nominal thickness <2.5mm average value ≤0.2mm | fulfilled | BS EN433:1994 | product indentation measured from loads | |
| flexibility diameter of Mandel 20mm | no cracking ai 20mm | fulfilled | BS EN433:1994 | product measured for damage after bending | |
| stubbed cigarette | method A ≥ rating 3 | fulfilled | BS EN433:1998 | surface changes measured after exposure to stubbed cigarettes [method A]and spontaneous burning [method B] | |
| stubbed cigarette method A, vertical load [5±0.1]N | ≤250mm3 | 199mm3 | ISO 4649:1985 | measurement of product surface abrasion | |
| Hardness | ≥75 shore A | 89 | ISO 7619:1986 | measurement of product hardness | |
| dimensional stability | Tolerance allowed: ±0.4% | -0.02% | BS EN 434:1994 | dimensional changes measured after exposing the product to heat | |
| General properties | Chemical resistance | fulfilled | BS EN423 | External changes were measured after exposing samples to chemical for determining amounts of time and then washing | |
| slip resistance ramp test | R9 | DIN51130:1992 | slip resistance measured by directly walking on differently sloping ramps | ||
| General properties | Smoke density | ≤ds450 | fulfilled | ASTM e662 | the density of smoke resulting from the burning of the product measured |
| surface flammability | ≥0.45w/cm2 | ASTM e648 | radiant heat value required for ignition of the product measured to gauge surface flammability properties |

Product Description


Product Application

FAQ
Q1: Is your company a trading company or a factory?
A: We are a manufacturer, but a trading company sells the goods
A: We are a manufacturer, but a trading company sells the goods
Q2: How can I get a sample of required material for confirm the quality?
A: The product you see now is cut from our finished product, so you can know the quality of our production when you see the sample.
A: The product you see now is cut from our finished product, so you can know the quality of our production when you see the sample.
Q3: How is your sample charge?
A: For existing samples: free on charge when no more than 1 square meter. Express time will be 3 days. But you have to pay the freight.
A: For existing samples: free on charge when no more than 1 square meter. Express time will be 3 days. But you have to pay the freight.
Q4: How about your Minimum order quantity (MOQ)?
A: 200SQM.
A: 200SQM.
Q5: What’s the delivery time?
A: 5-10 days.
A: 5-10 days.
Q6: Can you help us to shorten the lead time? Because there is not enough time left for us to deliver the goods to our customer within the lead time.
A: In a way, yes, we can get our factories reschedule their production, as long as the lead time of our other customers are not affected.
A: In a way, yes, we can get our factories reschedule their production, as long as the lead time of our other customers are not affected.
Q7: What’s your terms of payment?
A: 30% in advance, the other 70% before shipment.
A: 30% in advance, the other 70% before shipment.
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shanghai Yunyi International Trade Co., Ltd
Location
352 Wenxiang Road, Songjiang District, Shanghai
Contact Person
Chen
