Book Type Gift Box Making Machine , 15pcs/Min Corrugated Box Manufacturing Plant
Automatic Smart Packaging Rigid Book-Type Gift Box Making Machine Cardboard Box Maker Phone Box Wrapping System
stment rocker" to adjust the distance between the "baffles". The distance between the "baffles" should be close to the front of the tissue paper. Loosen the "limit lever adjustment handle" to adjust the distance of the "limit lever".
The distance between the "limit levers" should be close to both sides of the tissue paper. The main purpose of these two adjustments is to limit the position of the tissue paper so that it is fixed in the same position without changing.
"Paper guide adjustment" can be adjusted according to the size of the surface paper. Its main function is to guide the surface paper that has entered the rubber roller to prevent it from folding in half.
| Type | LS-1246B |
| Paper size(max) | L800*W600mm |
| paper size(min) | L135*W100mm |
| Max cardboard size | L760*W560mm |
| Min cardboard size | L120*W100mm |
| Box size(length) | L100-600mm |
| Box size(width) | W60-400mm |
| Box size(height) | H15-120mm |
| Paper thickness | 80-350g/m2 |
| Cardboard thickness | 0.8-3mm |
| Edge folding size | 10-90mm |
| Turn in depth | 15-80mm |
| Working speed | 15-25 pcs/min |
| Motor power | 13kw/380v 3phase |
| Heating power | 8kw |
| Air pressure | 40L/min 0.8MPa |
| Weight of machine | 3800kg |
| Machine dimension | L6600*W3800*H3000mm |
2. Storage function for the positioning part, easy to adjustment
3. Pick up box system, can avoid to scraping cover paper, suitable for making high-end boxes
4. Robotic arm (Yamaha/Delta/Mitsubishi)
5. Double Germany cameras (1000 pixels)


Machine setting time: Short in 45 minutes


Market positioning: Middle and high-end market
Space of Dongguan Fty:10598m2
Major market: America, Europe, Asia, Mid-east.
A1: We prefer T/T or L/C at sight. If you prefer other payment terms, please contact us freely.
Q2: What is your packing way? Can I have the customized package?
A2: We have the standard export package. For more details about the customized package, please contact us.
Q3: What is the delivery lead time?
A3: It depends on the order quantities. The mass production lead time is about 7-12 days after receipt of the deposit.
Q4: Are you a factory or a trading company?
A4: We are a factory. We provide all kinds of OEM/ODM services for clients around the world.
Our Services
1. Professional QC and QA team to make sure all products qualified before shipping.
2. Competitive price
3. Professional service
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.