Hebei Yachen Electric Co., Ltd
                                                                                                           
Verified Supplier
41 Years
Since 1985
Menu

1kg Anti Explosion Transformer Silica Gel Breather Round Flange

Price Negotiable
Price: negotiate
MOQ: 1 piece
Delivery Time: 3-10 working days
Brand: Hebei Maier
Product Description

1kg Anti-Explosion Transformer Dehydrating Breather with Silica Gel

Product Description

The dehydrating breather is used to dry the intake air of transformers.
If the operating temperature of the transformer drops, air will be sucked in through the oil container, cleaned of dirt particles and subsequently dried by the silica gel inside the assembly
The oil trap prevents any permanent contact between the silica gel and the moist ambient air and also filters the inflowing air. If the temperature rises, air is expelled from the conservator and flows through the transformer dehydrating breather type L in the opposite direction. The size of the dehydrating breather which has to be used depends on the oil volume and the frequency of the air exchange.

 

Specifications and uses

 

Used for absorption of moisture vented from storage tanks
Size: Customized
Condition: New

 

Code Model D (mm) H (mm) Silica Gel Wight (kg) Transformer Capacity of Oil (kg) Applicable Transformer Capacity (reference value)
M-686.2 XS3-0.5 135 200 0.5 1500 Below 200KVA
M-686.3 XS3-1 140 390 1 3500 Below 630KVA
M-686.4 XS3-1.5 140 430 1.5 5000 Below 2000KVA
M-686.5 XS3-2 140 460 2 7000 Below 3150KVA
M-686.6 XS3-3 170 500 3 10000 Below 10000KVA
M-686.7 XS3-5 170 550 5 22000 Below 50000KVA
M-686.8 XS3-10 220 670 10 35000 Below 500000KVA

 

Features

 

  • Controller adjusted to application-specific model of the devices

  • DIN flange for optimal mounting

  • Test button for performing self-tests

FAQ

Q1: What is your MOQ?

A: Our MOQ is 1 piece.

Q2: Do you offer sample?

A: Yes, we can provide you a sample.

Q3: What is your payment term?

A: 100% TT in advance.

Q4: What is your lead time?

A: 3-10 work days after order confirmed. Urgent need please discuss with us to find a way out!

Q5: Are you a manufacturer or a trader?

A: We are a manufacturer and all the items mentioned are made by ourselves. We have our own sales team to provide you the best export service too.

Q6: Can you make the packing and logo as customer request?

A: Yes we can.

Product picture

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hebei Yachen Electric Co., Ltd
Location NO.6, Middle road, New district, Hejian city, Hebei province, China
Contact Person Amy Li

Request A Quote

Please check your email address.
Your message must be at least 20 characters.