Dongguan chengkang mold plastic co., ltd
                                                                                                           
Member Supplier
28 Years
Since 1998
Menu

LKM 200000shots/2yrs Plastic Injection Molded Parts EDM Electronics Hard Disk Bolt Molding

Price Negotiable
Price: Negotiable
MOQ: 100
Delivery Time: 30 workdays
Brand: OEM
Product Description

Plastic Electronics Hard Disk Bolt Injection Molding Plastic Injection Molded Parts

 

Name Plastic Electronics Hard Disk Bolt Injection Molding Plastic Injection Molded Parts
Core Material High hardness alloy steel with heat treatment, wear resistance, corrosion resistance
Plastic Material PA
Weight 3g
Mold Equipment CNC, EDM, precision grinder, milling machine, driller, wire
Products Color Black
Mould Life 200k shots/2 years
Mould Precision +/-0.05mm
Application Area Plastic Injection Molded Parts
QC Equipment Quick checking tools
Delivery Time 4-8 weekends
Package Method Mold by wooden box, products by carton. As you required
Export Port Shenzhen port

 

About us

Since 1998 we set up our company in the south shore of china,we become from a small mould processing factory to a professional mould and plastic parts producing company.we have worked with many different field enterprices.

 

Why choose us?

1,we are a reliable supplier in this field for 23 years

2,to work better with our clients we upgraded our facilities

3,we offer you service in 24/7

3,most of our goods are qualified

4,Shiping on time,don't worry about the delivery

5,last but not the least,we can give you a factory price with quality products

 

FAQ

Q: What do you gurantee your products quality?

A: we have a qulity check team to ensure products quality before them get shipping,if the products quality were not satisfied by you and we checked the reason of the unqualified was us,we'll arrange to produce another products and ship them for you asap

 

Q:How long does it take with the lead time?

A: Usually we need 25-30 working days for mass production.

 

Q:How do you ship the goods?

A: Ship by DHL, UPS, FedEx or TNT.

 

Q:How long does it take to arrive?

A:It takes10 days around to arrive

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan chengkang mold plastic co., ltd
Location Building 6 and 9, Jinxia Yifang Industrial Zone, Chang 'an Town, Dongguan City
Contact Person Rapha

Request A Quote

Please check your email address.
Your message must be at least 20 characters.