High Quality 10 Shuttle Circular Loom Machine Woven Sack Production Line

Price Negotiable
Price: USD
MOQ: 1 set
Delivery Time: 3 months
Brand: United Win
Product Description

10 Shuttle Circular Loom Making Machine Woven Sack Production Line UW-2250×10



Description:

 

UW series circular lloom, which adopts the Single Chip Microcomputer, carry out centralized control to the system; the parameter is set up and changed on Human Machine Interface. Main motor and take-up motor are respectively driven by dual inverters. The system can change and update the data in time, reaching high accuracy and move ahead simultaneously. The function of accurate weft cloth compensate, can carrying on by weft density adjustment in time, improving fabric's quality and the qualification rate. Mechanical malfunction can be displayed in sub-area and recorded in detail.

 

Update weft-end and weft-break detection methods, by mirroring Germany advanced technology. The new technology can prevent the machine from false operation and improve the precision of weft tape detection. Meanwhile, the new technology has overcame the difficulty of detecting the weft tape due to low rotary speed, and has removed the trouble of asynchronism between rotational speed shift of the host machine and that of take-up motor.

 

 

Specifications:

 

Item UW-650×4 UW(Z)-850X6H UW-1350×6 UW-2200×6 UW-2250×10
Number of shuttles(Pcs) 4 6 6 6 10
Folding width of cloth(MM) 150-650 300-850 900-1350 1500-2200 1750-2250
Number of warp(Pcs) 576  700 1200 2880 2880
weft density(Pcs/Inch) 8-16
Max. speed(R/Min) 160 150-180 110 80 70
Power of main motor(Kw) 2 2.8 5.5 7.5 11
Max.weft Bobbin diameter Ф 100 Ф 115 Ф 90
Overall dimension(L×W×H) 8500×2500×2900MM 10500×2800×2920MM 10850×3000×3500MM 16480×3600×4580MM 16480×3600×4580MM
Weight (about) 2000KG 2400KG 4200KG 8000KG 9000KG

 

 

Machine photo:

FAQ:

 

1. How long will your engineer reach our factory?

Within one week after everything ready (machine arrival your factory, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?

We will finish installation and training within 15 days.

 

3. What should we charge for your engineer?

You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 150USD one day per person.

 

4. How long is your machine's warranty period?

All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.

 

5. How could you do if the parts broken within warranty?

We would express the free replacement parts during the warranty date.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHANGZHOU UNITED WIN PACK CO.,LTD
Location Room 201 & 202,Building A, No. 7 Longhui Road, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
Contact Person James

Request A Quote

Please check your email address.
Your message must be at least 20 characters.