Three Layer PP Tape Extrusion Line For Mesh Bag Strap 800mm

Price Negotiable
Price: USD
MOQ: 1 set
Delivery Time: 3 months
Brand: United Win
Product Description

Single Screw Double Lines Full Automatic PP Plastic Straps Production Line

 

 

Description:

 

The plastic tape extrusion line introduces and absorbs German advanced technology, adopts PLC program control, frequency control and other advanced technologies. The main electrical components are made of foreign high-quality products; the screw barrel of the extruder is made of 38crmoaia high-quality steel; the cold water box is made of high-quality stainless steel plate, the seven roller drawing machine is gear box type, and the single wire drawing and shaping are made of foreign advanced hot air oven, so that the main technical indexes of the unit can reach the international standard, with high speed, high output, low energy consumption and high efficiency The quality of monofilament is good. The whole unit has tight structure, beautiful appearance, stable operation, sensitive and reliable control, excellent manufacturing technology, convenient operation, safety and reliability.

 

The unit consists of the plastic extruder, filter, T-type die, cooling water tank, traction unit, edge yam crusher, hot stretching oven, splitter unit,stretching and fixing unit, winding machine, waste yarn recycling unit and electrical control cabinet.


 

Specification:

Item SJPL-G100×33-800 SJPL-G110×33-1100 SJPL-G120×33-1300 SJPL-G130×33-1500
Max.extrusion 330kg/h 400kg/h 500kg/h 600kg/h
Screw Dia. Φ100mm Φ110mm Φ120mm Φ130mm
L/D 33:1 33:1 33:1 33:1
Screw RPM 20-120r/min
T die Lip length 800mm 1100mm 1300mm 1500mm
Max. line speed 450m/min
Tex. range 60-200tex
Draw Ratio 4-10
winder No.S 132 180 216 252

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Machine Picture:

 

 

FAQ:

 

1. How long will your engineer reach our factory?

Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?

We will finish installation and training within 15 days.

 

3. What should we charge for your engineer?

You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.

 

4. How long is your machine's warranty period?

All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.

 

5.How do we solve the machine problem after your engineer leaving?

Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.

 

6.How could you do after one year warranty period?

We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.

 

7. What is your terms of payment ?

30% T/T in advance ,balance before shipment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHANGZHOU UNITED WIN PACK CO.,LTD
Location Room 201 & 202,Building A, No. 7 Longhui Road, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
Contact Person James

Request A Quote

Please check your email address.
Your message must be at least 20 characters.