6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S

Price Negotiable
Price: USD
MOQ: 1 set
Delivery Time: 3 months
Brand: United Win
Product Description

Jumbo Ton Big Bag 6 Shuttle Circular Loom Weaving Machine
 
 
Description:
 
6-shuttle there are 6 shuttles installed with circular loom which able to weave simultaneously.
 1. Lead-out speed of weft of current high-speed circular loom has reaches at about 5m/s, only weft of good-quality can fit it. In general 4m/s suits widely, for the case of same folded diameter and woof speed, production rate of 12 shuttles is 2 times of 6 shuttles, 1.5 times of 8 shuttles and 1.2 time of 10 shuttles respectively.
 
2.For fabrics, break of one weft thread means flaw, since it's difficult to avoid weft break completely, we have to reduce the affection of weft break, to increase shuttles is proven to be benefited , as follows:

shuttle (piece) 4 6 8 10 12
loss of strength for break of one weft thread(%) 25 16.7 12.5 10 8.3

As such loss of strength for 12 shuttles will be less then 10% while one weft breaks.
 
3. For same folded diameter, weaving speed and weft, time interval of weft change will be 2 times of 6 shuttles, 1.5 times of 8 shuttles and 1.2 time of 10 shuttles respectively, such that continuous running time of 12 shuttles will be longer than that of 6 shuttles,8 shuttles and 10 shuttles, if figured for 2-3 man operating two set of 12 shuttles circular loom, the efficiency and economy will be perfect.
 


Specifications:
 
 

No.s Mould Shuttle Qty.(pcs) Max.fold width(mm) Max. Open width(mm) Warp no.s(pcs) Speed(RPM) Main power(KW)
1 UWCL-24/16000 24 8200 16400 8000 5~25 37
2 UWCL-20/11000 20 5500 11000 5376 5~28 22
3 UWCL-16/8300 16(12) 4150 8300 4800 5~41 18.5
4 UWCL-12/7800 12(14) 3900 7800 4400 5~41 18.5
5 UWCL-12/7200 12(14) 3600 7200 3780 5~45 18.5
6 UWCL-12/6500 12 3250 6500 3520 5~51 11/15
7 UWCL-12/6000 12(10) 3050 6100 3200 5~51 11/15
8 UWCL-12/5400 12(10) 2700 5400 2880 5~64 11/15
9 UWCL-10/4800 10(8) 2600 4600 2780 5~64 11
10 UWCL-10/4400 10(8) 2100 4500 2740 5~72 7.5/11
11 UWCL-8/3500 8 1650 3600 1996 5~80 7.5
12 UWCL-6/3200 6(8) 1400 3000 1820 5~80 7.5
13 UWCL-6/2700 6 1350 2700 1510 5~100 7.5

 

 

FAQ:
 

1. How long will your engineer reach our factory?

 Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?

We will finish installation and training within 15 days.

 

3. What should we charge for your engineer?

You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.

 

 4. Does your engineer understand English? 
 Our engineers understand a little English. All our engineers have more than five years machine installation experience.

 

5. How could you do if the parts broken within warranty?

We would express the free replacement parts during the warranty date

 

6. Can you help us find any engineer in our location?

Of course, we will check and inform you as soon as possible.
     
7. How do we solve the machine problem after your engineer leaving?

Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time.Our engineers will take a solution video according your description.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHANGZHOU UNITED WIN PACK CO.,LTD
Location Room 201 & 202,Building A, No. 7 Longhui Road, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
Contact Person James

Request A Quote

Please check your email address.
Your message must be at least 20 characters.