Epe single pearl cotton foaming extrusion equipment production line

Price Negotiable
Price: USD
MOQ: 1 set
Delivery Time: 3 months
Brand: unitedwin
Product Description

Non Woven Cross Cutting Machine with Ultrasonic Welding

 

 

Descipition:

 

Pearl cotton foaming cloth machine is a kind of single-machine foaming extrusion equipment, it takes polyethylene as raw material, in the extrusion process of high pressure injection of anti-shrinkage agent, foaming agent mixed, after the die head extrusion, cooling shaping, flattening, traction, winding, finished product. The equipment adopts frequency conversion speed regulation and intelligent digital display instrument, automatic control, structure, stable and reliable performance, easy to operate. Its products are more popular in the market today a new type of flexible packaging materials, it is widely used in electrical appliances, furniture, porcelain, aluminum, precision instruments and other products with excellent cushioning shock absorbers, sound insulation, heat insulation, is the ideal substitute for traditional materials.

 

 

 

Main configuration list :
 

model unit SH - 75 SH - 90 SH - 105 SH - 120 SH - 135 SH - 150
Length to diameter ratio   At 1:55 At 1:55 At 1:55 At 1:55 At 1:55 At 1:55
The screw rotation speed R/MIN 5-50 5-50 5-50 5-50 5-50 5-50
Products range MM 700-1200 11-1800 1100-200 1200-2000 1300-2000 1300-2000
The thickness of the products MM 0.3-3.0 0.5-5.0 0.5-7.0 0.8-9.0 1.5-10 0.2-12.0
Cooling method Water cooling, air cooling
Foaming rate 20-40
Installed power KW 65 90 110 130 150 160
size M 20 * 2.3 * 2.2 22 * 2.3 * 2.2 23 * 2.3 * 2.2 25 * 2.3 * 2.2 27 * 2.5 * 2.3 30 * 2.5 * 2.3
The weight of T 7.5 8.5 9 10 12 15

 

Company Information:

 

FAQ:

 

1: Are you trading company or manufacturer?
We are factory.

2: How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock. It is according to quantity.

3: What should we charge for your engineer?
You should charge for the cost of our engineer's visa , air tickets, hotel, food ,and also their salary 100USD one day per person.

 

4: How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.

5: How could we do after one year warranty period?
We also can do service for you, but you need pay salary for my technician 80USD/day.

6: How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.

7: Does your engineer understand English?
Our engineer understand a little English. All our engineer have more than five years machine installation experience. In addition, they can use body language to communicate with customer.

8: Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.

9: How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHANGZHOU UNITED WIN PACK CO.,LTD
Location Room 201 & 202,Building A, No. 7 Longhui Road, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
Contact Person James

Request A Quote

Please check your email address.
Your message must be at least 20 characters.