HDPE Plastic Tape Extrusion Production Line Flat Film Stretching Machine

Price Negotiable
Price: USD
MOQ: 1 set
Delivery Time: 3 months
Brand: UW
Product Description

High Speed Plastic Extrusion Flat Film Stretching Machine Flat Yarn Extrusion Production Line


 

Features:
1.Electrical control unit: adopt the European famous-brand processor control (PC) to monitor and control the whole line centrally and fully,

bring the easier operation and more stability. (option)
2. Slitting unit: adopt thenew-typeadjustable strucure, prolong the blade using time.
3. Integrated holding unit: renew the previous film take-off and holding structure, meet the higher line speed requirement.
4.Electric component unit: adopt world-famous brand product with international guarantee.
5. Apple to produce the PP, HDPE normal tape, fibrillated tape, folded tape and some other flat-type tape with various specifications.



Technical Parameters:

 

Item UW-G100×33-800 UW-G110×33-1100 UW-G120×33-1300 UW-G130×33-1500
Max.extrusion volume 330kg/h 400kg/h 500kg/h 600kg/h
Screw Dia Φ100mm Φ110mm Φ120mm Φ130mm
Ratio of L/D 33:1 33:1 33:1 33:1
Rotate speed of screw 20-120r/min
Length of mold lip 800mm 1100mm 1300mm 1500mm
Max.production speed 450m/min
Flat yarm fibre scope 60-200tex
Drwing of winde 4-10
Winding number 132Spindles 180Spindles 216Spindles 252Spindles



Machine Configuration:

 

Standard Option
Material loading Hot air oven,length 6 m
Auto vacuum material-feeding loader
Film take-off Melt pump
With multi drives and moisture absorption unit
Automatic filter Static mixer
Flat Die Screw type loader/mixing unit
Gravvimetric dosing/mixing unit
Water quench tank Flat tape fibrilator unit
Slitting Unit Flat tape fibrilator unit
Integrated holding unit Film thickness gauge and control system
Edge trim recycle and reefed system Industrial Process Computer/Eurpe
Stretching section with 6 godets, incl.heating unit Multi stretching and annealing section
Vacuum tape extraction incl.collection box  



Product structure diagram:

Applications:

FAQ:

 

1. How long will your engineer reach our factory?

Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)

 

2. How many days will you finish installing?

We will finish installation and training within 15 days.

 

3. What should we charge for your engineer?

You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.

 

4. How long is your machine's warranty period?

All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.

 

5. How could you do if the parts broken within warranty?

We would express the free replacement parts during the warranty date

 

6. How could you do after one year warranty period?

We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.

 

7. What is your terms of payment ?
30% T/T in advance ,balance before shipment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHANGZHOU UNITED WIN PACK CO.,LTD
Location Room 201 & 202,Building A, No. 7 Longhui Road, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
Contact Person James

Request A Quote

Please check your email address.
Your message must be at least 20 characters.