12038 DC Axial Cooling Fan 12V 24V 48V Aluminum Frame 9 Blades 120x120x38mm
DC Axial Cooling Fan 120x120x38mm 5V 12V 24V Aluminum Frame With 9 Blades
DC Axial Cooling Fan RGD12038
Energy Saving Noise Reduction Soft Wind Long Lasting
Basic Parameter:
The models listed below have pulse sensors.
| Model No. | Rated Voltage | Operating Voltage Range | Rated Current | Rated Input | Rated Speed | Max. Airflow | Max. Static Pressure | SPL | Operating Temperture | Expected Life | ||
| [V] | [V] | [A] | [W] | [min¯¹] | [m³/min] | [CFM] | [Pa] | [inch H₂O] | [dB(A)] | [°C] | [h] | |
| RGD12038H12BPL | 12 | 10.2 to 13.8 | 4 | 48.0 | 6000 | 7.35 | 260 | 340 | 1.37 | 64 | -20 to +70 | 40000/60°C |
| RGD12038L24BPL | 24 | 20.4 to 27.6 | 2 | 48.0 | 6000 | 7.35 | 260 | 340 | 1.37 | 64 | ||
| RGD12038H24BPL | 0.46 | 11.0 | 3400 | 4.02 | 142 | 126 | 0.51 | 48 | ||||
| RGD12038H48BPL | 48 | 40.8 to 55.2 | 1 | 48.0 | 6000 | 7.35 | 260 | 340 | 1.37 | 64 | ||
Drawing:
Characteristic Curve:
RGD12038H12BPL RGD12038L24BPL RGD12038H24BPL
RGD12038H48BPL
Parts:
Payment:
1.Trade Assurance: In the first order, we suggest you use Trade Assurance.
2.T/T: If stocks,100% payment before shipping; if customized order, 30% deposit before production and balance 70% should be paid before delivery.
3.Western Union, Money Gram, Paypal, all available.
4.L/C: for large order.
Shipping:
1.ln general, we use international express, DHL, UPS,FedEx,EMS,TNT, etc.Large order: by air or sea, you should choose it.
2. if you have your own forwarder, please tell us the detailed information.
Q1: Are you a trading company or manufacturer?
A1: We are a factory specializing in Thermal and Terminal solutions for 18 years.
Q2: Where is the location for Linkwell Electric?
A2: Our Head company in Shanghai, Factory in Kunshan, closed to shanghai.
Q3: Can you make customized products or packing?
A3: Of course, we have a technical team with rich experience in OEM production. We can also make customized models according to provided samples. A package can be customized as demanded.
Q4: How long is the production time?
A4: Usually it takes about 2-3 weeks upon receipt of order advance payment.
Q5: How about the after-sale service? What are the warranty terms?
A5: Our salespeople and engineers will always ask you to solve problems. Quality warranty is 1 year
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.





