TIANJIA INDUSTRY CO., LTD(NINGBO FEICHI INTERNATIONAL CO.,LIMITED)
                                                                                                           
Member Supplier
16 Years
Since 2010
Menu

2cc 24/400 24mm Replacement Lotion Pump Head Reusable Shampoo And Conditioner Dispenser

Price Negotiable
Price: Negotiation
MOQ: 10000PCS
Delivery Time: 15-20 work days
Brand: SUN-MOON
Product Description

18mm 20mm 24mm PP Plastic Bamboo Bottle Spray Pump Mist Spray Treatment Pump

 

 

 

 

Quick Detail:

  • Neck size: 28-400 which is 28 mm wide, and 400 refers to threading
  • Length: 9-inch dip tube including cap
  • Color: black pump top, clear dip tube
  • Material: polypropylene #5, food safe, bpa-free

 

 

Product Info: 

<

Product Name Lotion Pump
Item No.: YT-PUL-003
Closure size 24/410;24/415;28/400;28/410;28/415
Closure option Smooth;Ribbed; Aluminium; UV; Bamboo; Water transfer printing
Lock system Up/down
Output 2.0CC/T
Key Points Two pcs glass balls in pump
Material PP
Spring Use SUS 304 Spring
Color Customer can choose any color
Key words Spring inside
Tube Customer can choose the length of tube
Packing 1000pcs/ctn
Carton Size 60*38*40


Usage:

moisturing water, essencial oil, Sunscreen water,Remover,Tonic,Liquid soap, skin care lotion, face cream, shampoo, cosmetic bottles,etc

Personal health daily usage(scented water, perfume bottle, air freshener, face & body cleaner, treament, air conditioner, Hyaluronic Organic water etc)

 

 

 

FAQ

1. What is your payment term?

30% TT advance,and balance 70% upon of BL.

 

2. What is your shipping way?

Depending on you, you can choose by air or sea,You can also choose express.

 

3. Can we get your free samples?

Yes,you can. Samples are free but the freight for express is on buyer's account.

 

4. How do you ensure the quality?

We can send you some samples for a look.

 

5. If any quality problem, how can you settle it for us?

If it is due to wear and tear during transportation, we recommend that you claim compensation to third parties

If the quality of the product itself, we will be solely responsible.

 

6. What is the lead time?

That depends on the specific items and your order quantity. Normally, Sample needs 2-3 days prepared; mass production time needs 25 days normally.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company TIANJIA INDUSTRY CO., LTD(NINGBO FEICHI INTERNATIONAL CO.,LIMITED)
Location Add: No. 311-1 Jinsheng Road ,Yuyao 315400 ,Zhejiang ,China.
Contact Person Jennifer

Request A Quote

Please check your email address.
Your message must be at least 20 characters.