Guangzhou EverSung International Trading Co., Ltd.
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

140mm Stroke Car Front Hood Lift Support For NISSAN Frontier Navara D40 Pathfinder

Price Negotiable
Price: Negotiation
MOQ: 100
Delivery Time: 5-8 Work day
Brand: EverSung
Product Description

Front Hood Lift Support For NISSAN Froneier Navara D40 04-18 Path Finder Year 05-13

 

Front Hood Lift Support Specification

 

Product Name Nissan Navarra Hood Lift Support
Year Suitable for Navarre D40 04-18 hood
Model Nissan Froneier D40 04-18
Model Nissan Pathfinder year 05-13
Item No D40-04-18
Installation Distance 370(mm)
Stroke 140(mm)
Package 1 bag x accessories
Applicable Models Front Hood Shock

 

Front Hood Lift Support Feature

 

High-quality Material

The cover gas brace is made of high-quality metal material, which has high hardness, good elasticity, and is not easy to crack or deform. The support arm of the pneumatic elevator is sturdy, not easy to rust, durable, reliable, and has a longer working time.
Design Process

The air spring support arm of the front engine hood and hood can improve the lifting capacity, and the shock absorption lifting pillar has no abnormal noise and self-cleaning piston parts. Inflatable shock absorption auxiliary accessories make it easier and more convenient to open or close.
Easy to Install

Engine hood gas spring damper support bracket kit only needs to remove the bolts and fasten the shock absorber bracket and then tighten the bolts. The shock absorber support rod can be easily replaced without drilling holes by yourself.
Improve the appearance and handling of your engine compartment.
Its surface is smoother and more corrosion resistant.
The cylinder block is made of thickened precision steel pipe, which has a very high pressure resistance and is not easily deformed.
Use high quality seals, long service life.

 

Front Hood Lift Support Shipping 

 

1.Item will be shipped in 1-3 working days upon receipt the payment
2. It always takes About 12-35 Working days to reach, some countries will take little long time.
3. You also can choose express if you need our item soon, usually it will take 3-7 working days.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou EverSung International Trading Co., Ltd.
Location Shilou Village, Shilou Town, Panyu District, Guangzhou
Contact Person Dora Xie

Request A Quote

Please check your email address.
Your message must be at least 20 characters.