ZHUZHOU BANGBO HUANYU IMPORT AND EXPORT CO.,LTD
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu
Other Concrete Machinery

ISO90001 Certified Portable Concrete Pouring Machine With 170Liter Tank

Price Negotiable
Price: Negotiable
MOQ: 1 unit
Delivery Time: 7-20 working days
Brand: BANGBO
Product Description
New Concrete Mixer With Pump/Concrete Pump Truck Rental Rates

 

BANGBO Concrete Mixer Pump Features

  • 1. Mixing and pumping of the perfect combination, to save weight and transportation space frame.
  • 2. high work efficiency.
    3. Save labor costs, reduce labor intensity.
    4. Smaller power, consider the carrying capacity of rural power grid.
    5. Simple operation, easy to use.
    6. Double cylinder hydraulic pumping system, capable of delivering crushed stone concrete, stable performance, safe and reliable.
    7. Long distance delivery.
PRODUCTION NAME B3 Diesel
Concrete Mixer Pump
TECHNICAL   PARAMETER
TYPE   DIESEL
DISTRIBUTE VALVE   "S" VALVE
DIESEL BRAND   WEICHAI
COOLING FORM   WATER COOLING
POWER KW 72
MAX THEROTIC OUTPUT M3/H 30
MAX THEROTIC DISTANCE HORIZONTAL M 200
VERTICAL M 70
MAX DIA.OF AGGREGATES COBBLE MM 50
MACADAM MM 40
MAIN HYD. PUMP BRAND SET KAWASAKI
MAIN HYD. PUMP DISP. ML/R 112.00
MAIN HYD.PRESSURE BAR 320.00
MAX PUMPING DISCHARGE PRESSURE BAR 80
MIXER ROTARY SPEED R/M 15
MAIN CYLINDER   MM 100/70
DELIVERY CYLINDER MM 200
OIL TANK CAPACITY L 170
OUTLET OPENING DIAMETER MM 180
INNER DIA OF DELIVERY PIPE MM 125
LIFTING HOPPER CAPACITY L 450
DRUM MIXER MODEL L JS500
CAPACITY OF DISCHARGE L 800
DIMENSION(L*W*H) MM 5500*2000*3600
WEIGHT KG 5900
QUANTITY IN 20FT CONTAINER SET 1


Q1: Are you trading company or manufacturer?

A: We are factory. We can design and manufacture products as customers' request.

Q2: How long is the warranty period ?
A: We offer 12 months warranty for the machine (main body) from the date of installation finished.
Q3: How long is your delivery time?

A: Generally it is 7-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q4: What is your payment method?

A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery. We also support L/C, Western Union.

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company ZHUZHOU BANGBO HUANYU IMPORT AND EXPORT CO.,LTD
Location Room 317, 3rd floor, building 1, Zhuzhou Auto Expo Park Service Center, 66 PENTING Road, Tianyuan District, Zhuzhou City, Hunan Province.
Contact Person stacy

Request A Quote

Please check your email address.
Your message must be at least 20 characters.