Passivating OEM Cnc Precision Machined Components Stainless Steel Lathe / Turning / Miling
Surface Treatment:
Stainless Steel | Polishing, Passivating, Sandblasting, Laser engraving | ||
Steel | Zinc plating, Oxide black, Nickel plating, Chrome platingk, Carburized, Powder Coated | ||
Aluminum parts | Clear Anodized, Color Anodized, Sandblast Anodized, Chemical Film,Brushing,Polishing | ||
Plastic | Plating gold (ABS), Painting, Brushing (Acylic), aser engraving | ||
Our services
- Our custom CNC machining services always ensure that our customers received the highest quality CNC turned parts and the most thoughtful services.We has been specialized in providing professional OEM/ODM CNC turning services for high-quality but cheap CNC turning parts, CNC lathe parts or high precision machined components with advanced machines and skilled manual operation.
| Material | Aluminum, Carbon Steel, Stainless Steel, |
| Surface treatment | Anodising, Zinc Plating / Galvanizing, Chrome plating, |
| Drawings for price | 2D drawing / 3D model |
| Certification | ISO 9001:2015 |
| MOQ | 1 Piece |
| Tolerance | Generally +-0.02mm to +-0.05mm |
| Roughness | Ra 0.6-3.2 |
| Inspection | 1. 100% QC quality inspection before delivery |
| Packaging | 1. Standard: PE Foam, cartons/wooden case |
| Lead time | 1. 1 to 50 pcs 7-10 days |
Application
Agricultural equipment |
Computing equipment | Automobile industry | Armament |
Medical / dental instruments | Measuring instruments | Miscellaneous equipment | Textile equipment |
Pharmaceutical industry | Pumps and general connections | Petrochemical industry | Safety equipment |
Industrial valves | Fixing and movable equipment | Pharmaceutical industry | General machinery |
Orthopedic implants | Food and beverage processing | Instrumentation equipment | Sanitary fittings |
1) Checking the raw material after they reach our factory------- Incoming quality control ( IQC)
2) Checking the details before the production line operated
3) Have a full inspection and routing inspection during mass production---In-process quality control(IPQC)
4) Checking the goods after they are finished---- Final quality control(FQC)
5) Checking the goods after they are finished-----Outgoing quality control(QC)

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

