Galvanized Hy Rib Lath Wire Mesh for Retaining Walls 0.45m x 2m
Price:
USD1.2-USD2.5/PCS
MOQ:
10sqm
Delivery Time:
10-15days
Brand:
VELP
Product Description
Building Materials Retaining Walls Construction High Hy Rib Lath Wire Mesh Metal Formwork
Product Specifications
| Attribute | Value |
|---|---|
| Name | Building Materials Retaining Walls Construction High Hy Rib Lath Wire Mesh Metal Formwork |
| Material | Galvanized panel |
| Width | 0.45m |
| Length | 2m/2.5m |
| Thickness | 0.3mm/0.35mm/0.4mm |
| Feature | Corrosion Resistance, Acid-resisting |
| Usage | Interior/exterior |
| Surface treatment | Hot Dipped Galvanized |
| Keyword | Long life |
Product Overview
High ribbed formwork is a highly efficient, versatile, and economical system that is fundamental to modern commercial and multi-story construction. Its application streamlines the building process, reduces material usage, and provides a robust composite structural element, making it a preferred choice for developers and contractors aiming for speed, safety, and cost savings.
Key Features
- Light weight and easily bent/cut to required shapes
- Eliminates complex carpentry works
- Quick installation process
- Retains poured concrete effectively
- No special bonding preparation required for next pour
- Allows visual monitoring of pours
- Reduces risk of honeycombing
- Creates strong mechanical key for successive concrete pours
Technical Parameters
| Name | Formwork Hot Dipped Galvanized Steel Sheets Rib Metal Lath |
| Width | 0.45m |
| Length | 2m/2.5m |
| Thickness | 0.3mm/0.35mm/0.4mm |
| Feature | Easy to cut/Long life |
Applications
- Fire walls in residential buildings
- Partition construction
- Floor slabs and partition walls
- Inside and outside walls of permanent houses
- Tide protection structures
- Tunnels, sewers, and fences
- Shipyards and retaining walls
- Panels and arch floors
- Nuclear power plants and storage bunkers
- Landscaping and sculpture projects
- Slope protection and claybanks
Advantages
- Faster installation than plywood or steel formwork
- Can be placed before rod reinforcement
- Eliminates joint surface preparation
- Allows high rate of concrete rise
- Enables visual monitoring of pours
- Reduces risk of voids and honeycombing
- Eliminates formwork stripping (only supports removed)
- Can be supported by existing reinforcement
- No need to clean, reface, or oil formwork
Our Services
- Online Technical Support
- Onsite Installation
- Onsite Training
- Onsite Inspection
- Free Spare Parts
- Return and Replacement
Frequently Asked Questions
Q1: Can I get free samples?
A: Yes, we have free samples available anytime.
Q2: What materials do you use?
A: Carbon steel and galvanized plate.
Q3: Is there quality control?
A: Yes, all production lines have adequate quality control.
Q4: What are your payment terms?
A: T/T 30% deposit, 70% balance before delivery. We provide product videos before final payment.
Q5: What is the delivery time?
A: Typically 15 days after receiving deposit. Exact time depends on order items and quantity.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Anping Velp Wire Mesh Products Co.,Ltd
Location
East industrial zone,Anping County,Hebei Province China
Contact Person
Suzen