CHANGSHU HONGYI NONWOVEN MACHINERY CO., LTD
                                                                                                           
Verified Supplier
12 Years
Since 2014
Menu

HONGYI Fiber Mixing Machine Fiber Density Spreads Even

Price Negotiable
Price: negotitable
MOQ: 2sets
Delivery Time: 30 days.
Brand: HONGYI
Product Description

Fiber Mixing Nonwoven Hopper Feeder Machine Master Big Chamber Blender

 

Packing before shipment is a considerable effort for us where we always care for the safety of the machines.

1. Draw machine packing chart before loading the machine.

2. Segregate the machines to load them with ease after the successful trial and testing of the machine.

3. Wrap the machines with felts and wound films to ensure the safety of the machines and avoid any breakage due to jolting of the vehicles. ( Truck or Ship)

4. Spare parts are kept in the wooden case to avoid breakage.

5. Note the details of the machines after loading in each containers and make the descriptive details of containers which is then forwarded to customers for their reference.

 

Features:

1. Photoelectric control during the production process.

2. Fiber density spreads even.

3. The stripper and evener roller are in the independent transmission. This will be with high dependability, easy adjustment and maintenance.

4. The spike lattice with the machine behind control the feeding by Photoelectric to make the blending evener.

 

Technical parameters:

Working width 1400mm, 1700mm, 2500mm
Storage volume 16m3-30m3
Capacity 300kg/h, 500kg/h, 800kg/h
Installed power 8.8Kw

 

Trade information:

Trade terms FOB, CNF, or CIF
Lead time 90 days after deposit.
Payment terms 30% advance payment, 70% paid off before delivery.
Warranty twelve (12) months after mechanical and electrical commissioning.
After-sale service

The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD180/Day/engineer and totally installation period is about 30-40 days depending on well cooperation of the buyer.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company CHANGSHU HONGYI NONWOVEN MACHINERY CO., LTD
Location No.11 Kaicheng Road ZhiTang Town ChangShu City JiangSu Province China
Contact Person Rainbow Li

Request A Quote

Please check your email address.
Your message must be at least 20 characters.