Jiangsu Xinyuanxing Metal Products Co.,Ltd
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

ASTM 16.5mm OD 304l Stainless Steel Pipes Sch10 Seamless Pipe Tube

Price Negotiable
Price: Negotiation
MOQ: 1 TON
Delivery Time: 3-7 working days
Brand: TISCO
Product Description

ASTM 16.5mm OD 304l Stainless Steel Pipes Sch10 Seamless Pipe Tube Stainless Steel Water Pipe

 

Stainless steel pipe is a hollow section, the surrounding no seam of the long steel. Is resistant to air, steam, water and other weak corrosive media and acid, alkali, salt and other chemical corrosive media corrosion of the steel pipe. Also known as stainless acid resistant steel pipe. Widely used in petroleum, chemical, medical, food, light industry, mechanical instrument lights industrial pipelines and mechanical structural components.  

 

Product Introduction

 

Product name Stainless Steel Pipe/ Tube
Place of Origin China
Type Seamless
Model Number 300 Series, 304L
Technique Cold Rolled; Hot Rolled
Welding Line Type Seamless/Spiral Welded
Application Industry
Outer Diameter(OD) 16.5mm
Length 5.8m,6m,11.8m,12m or customized
Thickness 2 mm or customized
Processing Service Bending, Welding, Decoiling, Punching, Cutting
Section Shape Round
Surface Finish No.1
Surface polished, pickled, brighted anneal, mirror
Trolerance ±3%
Delivery Time within 7 days
321 stainless steel tube Surface Mirror, brushed, 6K, 8K, 2B, No.1, polished
Alloy Or Not Non-Alloy
MOQ 1 Ton
Payment terms: L/C T/T (30%DEPOSIT)
Price term CIF CFR FOB EX-WORK

 

Product Image

 

 

Test and Certificate

 

 

Application

 

FAQ


Q1.What’s your main products?
A1. Hot rolled,Cold rolled,Galvanized/Galvalume steel coils, prapainted galvanized steel coils, stainless steel coil and sheets, steel plate etc.

 

Q2.Can we visit your factory?
A2.Of course. If we have your schedule, we will arrange our professional sales team to follow up your case.

 

Q3.How can you ensure the quality?
A3.All products have to go through three checks in the whole processing,we have professional team to deal with everything.

 

Q4.What is your delivery time?
A4.within 7 working days after receiving your balance payment.

 

Q5.What kind of equipment in your factory?
A5.Our factory have advanced hot rolled and cold rolling production equipment and testing equipment,it can ensure the quality,high efficiency.

 

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Jiangsu Xinyuanxing Metal Products Co.,Ltd
Location Liangxi District Wuxi ,Jiangsu,China.
Contact Person Helen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.