Abrasion Resistant Boiler Grade 400 Steel Plate 450 500 600
Price:
negotiable
MOQ:
3 ton
Delivery Time:
5-8 work days and depend on the quantity
Brand:
OEM/ODM
Product Description
Hot Rolled 400 Plates
Product Description
® 450 can be welded with all conventional arc welding methods for ordinary and high-strength steel. Use welding consumables with a yield strength of max.
500 MPa and a sufficiently low hydrogen content of max
|
Mechanical property
|
||||
| Grade | Tensile strength (Mpa) |
Elongation (%)(min) |
Hardness (HBW) |
-20℃ Impact AKv/J (min) |
| NM360 | ≥1100 | 12 | 330-390 | 24 |
| NM400 | ≥1200 | 10 | 370-430 | 24 |
| NM450 | ≥1250 | 7 | 420-480 | 24 |
| NM500 | 470(min) | |||
| NM550 | 530(min) | |||
| NM600 | 570(min) | |||
|
Mechanical property
|
|||
| Grade | Yield strength (Mpa) | Hardness (HB) | Impact energy |
| 400 | 900-1100 | 370-430 | 45J/-40℃ |
| 450 | 1100-1300 | 425-475 | 50 J/-40℃ |
| 500 | 1250-1400 | 470-540 | 37 J/-40℃ |
| 550 | 525-575 | 30 J/-40℃ | |
| 600 | 550-640 | ||
The wear-resistant steel plate is composed of a low-carbon steel plate and an alloy wear-resistant layer. The alloy wear-resistant layer is generally 1/3 to 1/2 of the total thickness. When working, the matrix provides comprehensive properties such as strength, toughness and plasticity against external forces, and the alloy wear layer provides wear resistance that meets the requirements of specified working conditions.
PACKAGE PER BUNDLE
1.Reinforcement of angle in steel wore rodcircles or according to customer's requirements.
2.Package in PVC material or according to customer's requirements
2.Package in PVC material or according to customer's requirements
SHIPPING
1.Delivery: Within 7-30 days after the confirmation of the order
2.Transport cargo to port by truck and will covered on the road and also covered at port.
3.Shipping by bulk or container
|
Packaging
|
Standard seaworthy export packing, other types of packing can be customized as every requirement.
|
|
Shipping packaging
|
Bundled with firm steel straps, easy for loading and unloading.
|
|
Shipping time
|
5-7 work days after delivery
|
|
Shipping way
|
BY SEA
|
|
Shipping port
|
ShangHai
|
Product show
If you have any question, please feel free to contact us any time.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Wuxi ShiLong Steel Co.,Ltd.
Location
Xinlian Building, Guangyi Street, Liangxi District, Wuxi City, Jiangsu Province,China
Contact Person
Ava

