Shock Absorber Tool with High-Purity Nitrogen Gas Damping Testing and Stainless Steel Connectors ZC-3515

Price Negotiable
Price: negotiated
MOQ: 1 unit
Delivery Time: 20-25 working days
Brand: AA4C
Product Description
AA4C Shock Absorber Oil Change and Nitrogen Charging Tool ZC-3515
The shock absorber oil change and nitrogen filling repair and testing equipment is a combination tool that includes a high-purity nitrogen gas machine, shock absorber damping testing machine, and a set of shock absorber filling joints. This equipment effectively solves problems such as shock absorber non-rebound and lack of damping, restoring shock absorbers to new car condition without replacement while maintaining original factory quality.
Equipment Operation Process
  1. Connect the gas source to 220V power supply, turn on the power switch - equipment automatically produces high-purity nitrogen gas
  2. Check initial damping of shock absorber and record data
  3. Place pre-repair shock absorber at sensor mount position, press pressure zero button to remove shock absorber weight before conducting damping test
  4. After damping data stabilizes on monitor, press save pressure button to store pre-repair damping data
  5. Press filing function key, select corresponding start function key, insert quick connector into oil filling joint to begin filling with new oil
  6. After new oil is filled, nitrogen will be filled and shock absorber pressure rod will rebound
  7. After filling corresponding amount of nitrogen, press function button to stop filling, cover with cloth block, and pull out filling connector
  8. Test repaired damping - display will show comparison data before and after repair
  9. Drain old oil by finding matching filling joint and connecting filling tube quick connector
  10. Seal and block, insert joint into shock absorber and invert it with oil drain port facing downward
  11. Lift tooth joint upward to open oil seal and insert shock absorber - oil will discharge
  12. Before draining oil, inject sufficient nitrogen gas into shock absorber for normal drainage
  13. Inject oil into equipment by opening injector valve and injecting equal amount of new oil through syringe
  14. Drain filling tube, unplug filling quick connect pipe to empty air, reinsert quick connect pipe, and close filling valve
  15. Adjust filling pressure to 4KG through pressure regulating valve



Technical Specifications
Parameter Specification
Voltage 220V
Nitrogen Purity 99%
Special Connector 9 pieces
Connection Type Stainless steel detachable and replaceable oil seal
Electronic Scale Accuracy 0.2
Number of Electronic Scales 1 piece
Net Weight 97kg
Package Dimensions 694*515*1678mm
Product Gallery

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shanghai AA4C Auto Maintenance Equipment Co., Ltd.
Location 5# Blgd, Yongbiao Industrial Park ,No.280 Jiugan Rd, Songjiang Dist, Shanghai, China
Contact Person Ring Zuo

Request A Quote

Please check your email address.
Your message must be at least 20 characters.