Single Pin ESE Lightning Ground Rod Customizable GB50057-2010
Single Pin ESE Early Streamer Emission , Lightning Ground Rod GB50057-2010
Lightning rod installation
After the lightning rod components are assembled, fastened with bolts or welding methods, the lightning rod as a whole fixed in the base.
1, the installation of lightning rod should be connected reliably.
2, after installation is complete, lightning rod each connection or metal surface coating damage, should do rust-proof treatment.
Fourth, the lightning rod maintenance
Lightning rod into use, the annual thunderstorm season before the following content to check.
(1) lightning rod connection parts of the connection should be reliable, do not allow loose.
(2) check the lightning rod receiver to the base of the total resistance value ≤ 5Ω.
(3) lightning rod should be grounded through the lead wire (dedicated or borrowed), grounding resistance value ≤ 10Ω.

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.


