IEC 62305-3 Stainless Steel Lightning Rod On Buildings Outdoor
Price:
Negotiable
MOQ:
5
Delivery Time:
Negotiable
Brand:
HAMMOND
Product Description
Stainless Steel Lightning Rod French original ESE4500 lightning rod outdoor
"HDE" through the combination of pulse transformer and oscillator, to achieve strict control of frequency and amplitude of high-voltage signal emission technology; its energy from the electrostatic field and electromagnetic field, and transformed into a high-voltage signal transmitted to the tip of the needle, generating a large number of electric ions, this function makes the "HDE" issued by the upstream lead wire tens or even hundreds of meters away from the lightning rod, with the downstream lead wire from the lightning cloud to pick up the flash, thereby expanding Lightning rod protection range.
This excitation device integrated in the air terminal is designed to increase the excitation distance and thus generate the
ascending tracer earlier(regarding to an ascending tracer naturally emitted by a simple rod.
All of our early streamer emission systems are tested in compliance with NF C 17-102 standard,edition September 2011.
ascending tracer earlier(regarding to an ascending tracer naturally emitted by a simple rod.
All of our early streamer emission systems are tested in compliance with NF C 17-102 standard,edition September 2011.
Specification
Installation Guidelines
3 main components are part of a lightning protection system. .The capturing device with its supporting mast and fixings.
The down conductor composed of one or several tin-ned copper tape with section in compliance with stan-dards in force,designed to flow the lightning current of the lightning conductor to the earthing system.This conductor will usually run outside the structure.Each fixing should allow an eventual conductor dilatation.Bend radius have to be inferior to 0.2 meters.Metalli-cal masses situated in the zone of separation calculated beforehand will be interconnected equipotentially to the lightning conductor.Each down conductor will be equipped at the bottom with a control junction and a 2 meter-high mechanical protective tube.
The earthing system with an adapted form in com-pliance with standards in force has for aim to diffuse the lightning current to the ground.An inspection pit will be installed to do the equipotential connection with the nearest electrical earth netword of the building. Installation quality of a lightning system is an impor-tant element ofr the efficiency of a lightning protection system. For each installation and in most of cases it will be bet-ter to start with the installation of the earthing sys-tems,then as direct as possible channels of each down conductor,then finish with the lightning conductor and roof circuit installation.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Hunan Heou Engineering Consulting Co., Ltd
Location
618, Goodbond Venture Base, No.18, Lu Yun Road, Yue Lu District, Changsha City, Hunan Province
Contact Person
cody

