Aetok Gas Equipment (suzhou) Co.,Ltd.
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

10 Bar Regenerative Air Dryer 1.5nm3/Min , 6 Bar Adsorption Compressed Air Dryer

Price Negotiable
Price: Negotiate
MOQ: 1 set
Delivery Time: 5-8 work days
Brand: AETOK
Product Description

High Pressure Heatless Regenerative Adsorption Compressed Air Dryer Air Cooling 1.5nm3/Min

 

AETOK is an agent of ORION machinery (Shanghai) Co., LTD., a foreign enterprise established by ORION co., LTD., which is specialized in producing oil-free vacuum pumps and air compressor post-treatment equipment in China. Main business scope: production and sales of vacuum pumps, industrial compressed air dryers, water coolers, industrial jet fuel heaters, hePA filters, dairy machinery and other related parts and components.

 

Inlet Temperature ≤38℃
Adsorbent Alumina,Molecular Sieving
Pressure Dew Point -20~-40℃
Regeneration Gas Consumption ≤13%
Inlet oil content ≤0.1ppm
Working Pressure 0.6-0.95Mpa
Control Mode Microcomputer Automatic Control

 

Main specialties

Energy-saving dew point sensor with standard configuration (medium and large series)

All function indicators are displayed.

Small size, light weight, convenient maintenance.

 

Heatless Adsorption Dryer Workflow

High Pressure Heatless Regenerative Adsorption Compressed Air Dryer Air Cooling 1.5nm3/min Provided 6-10bar CN;GUA Mikovs 185kg 1.Two towers drying in parallel
Before start-up, the inlet and outlet valves of the left and right towers are always open, and compressed air passes through both towers to the point of use at the same time.

2. The left tower is dried and the right tower is regenerated

After the power is turned on, the right tower inlet / outlet valve is closed, the right tower regeneration inlet / exhaust valve is opened, and the compressed air flows through the left tower to be dried. The dry air passes through the orifice plate, and the right tower is regenerated after being throttled and expanded.At this time, the pressure of the right tower should be 0 kg. The compressed air containing moisture is released into the atmosphere through the right tower regeneration exhaust valve and muffler.

left and right towers are always open, and compressed air passes through the two towers to the point of use simultaneously.

3.Regeneration is over, ready to boost
After 4 and a half minutes of regeneration, the right tower regeneration exhaust valve was closed, and the right tower began to boost pressure.
4. The left tower is dry and the right tower is boosted
The booster valve opens, and the pressure of the two towers slowly rises to equilibrium.After 5 minutes, the tower is changed to enter the next cycle.

 

Precautions When Using
 
1. The pressure of the drying tower should be the same as the pressure of the pipeline, which is displayed by the pressure gauge on the tower. High Pressure Heatless Regenerative Adsorption Compressed Air Dryer Air Cooling 1.5nm3/min Provided 6-10bar CN;GUA Mikovs 185kg
2. Intake should be 100% saturated humid air
3. Intake air temperature should be between 25-49 ℃
4. The pressure of the regeneration tower should be less than 0.22kg / cm2.
5. The standard working cycle is 10 minutes. One of the towers is dried for 5 minutes.At the same time, the other tower is regenerated for 4 and a half  inutes and the regeneration exhaust valve is closed.
6. Please note that the control air circuit should maintain a certain pressure value, otherwise the valve will not be able to switch automatically, and the minimum pressure of the control air circuit is 5kg / cm2.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Aetok Gas Equipment (suzhou) Co.,Ltd.
Location Wu Zhong district, Suzhou, Jiangsu,CHINA
Contact Person Leo

Request A Quote

Please check your email address.
Your message must be at least 20 characters.