China • Yuanda Valve Group Co., Ltd.
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu

Size 2" Flanged Swing Check Valve On Pipeline Of Reclaimed Water

Price Negotiable
Price: Negotiable
MOQ: 10 pcs
Delivery Time: 5-8 work days
Brand: Y
Product Description

 

Size 2 ”Used On The Pipeline Of Reclaimed Water Flanged Swing Check Valve

 

 

Principle of action

 

The valve is composed of valve body, valve cover, valve disc, rocker and other parts. The valve disc can automatically prevent fluid backflow. The valve disc of the valve is opened under the action of fluid pressure, and the fluid flows from the inlet side to the outlet side. When the inlet pressure is lower than the outlet pressure, the valve disc automatically closes under the action of fluid pressure difference, its own gravity and other factors to prevent the medium from flowing back.

 

connecting measurement

 

 

size L φ2 φ1 φ Z-Фd H
2" 203 152.4 120.7 50.8 4-Ф19 102
2.5" 216 177.8 139.7 63.5 4-Ф19 113
3" 241 190 152.4 76.2 4-Ф19 118
4" 292 228.6 190.5 101.6 8-Ф19 138
5" 330 254 215.9 127 8-Ф22.2 155
6" 356 279.4 241.3 152.4 8-Ф22.2 167
8" 495 342.9 298.5 203.2 8-Ф22.2 200.3
10" 622 406.4 361.95 254 12-Ф25 252.5
12" 399 482.6 431.8 304.8 12-Ф25 297.5

 

Material of main parts

 

Body material HT200
O-ring ZHMn58-2-2
Disc HT200
gasket 08+Flexible graphite
Stem HT200
Bonnet HT200

 

Storage, installation and use instructions

 

1.Storage, installation and use instructions 1. The valve shall be stored in a dry warehouse, and dust-proof and waterproof preparations shall be made. It is strictly prohibited to store in the open air.

2. For long-term storage, it shall be maintained regularly.

3. Before installation, check whether the model and specification of the pressure tested valve are consistent, clean the inside and outside of the valve, check whether the valve rotates flexibly and whether the sealing surface is damaged. After confirmation, installation can be carried out.

4. The pipeline or equipment on which the valve is installed shall be flushed or cleaned first to remove the oil, welding slag and other sundries in the pipeline or equipment to avoid scratching the valve sealing surface.

5. When manually loading and unloading the valve, it is prohibited to discard it.

6. The valve is usually installed on the horizontal pipeline, and cannot be installed on the vertical pipeline. Note that the medium flow direction is consistent with the arrow direction on the valve body.

7. Pressure test shall be carried out before installation, and installation can only be carried out if it meets the requirements.

8. The product shall not be subjected to large external force after installation.

9. The operating conditions shall be consistent with the requirements in the performance specifications.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company China • Yuanda Valve Group Co., Ltd.
Location Jianshe South Street, Yuhua District, Shijiazhuang City, Hebei Province, China
Contact Person Ada Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.