SUS304 250g Packet Packing Machine For Protein Powder Sachet Filling
Protein powder Sachet Filling Packing Machine 250g sauce filling packaging machine Nutrient sachet packaging machine
Factory Advantages:
1 Have many more than 10 years of food, daily chemical, pharmaceutical, and other industries service experience.
2. Patents: The company has 26 packaging machine design patents in china. Passed the ISO9001,CE,ROSH,DNV
3. After-sale: 6 engineers service team has many years of experience and Provide online technical support .
4. Partners: We established long-term relationship one of the world's top 500 enterprises such as the Mengniu Group, YILI Group.
Features
Automatic feeding and packing system , suitable for all kinds of material, adjustable size, plug and play, one piece one out, no material stuck, over-stable discharging, adjustable speed, one device can replace 2-3 people, even out, excessive and other abnormal and send alarm signal.
Specification:
| Model | RT-180G | RT-210G | RT-240G | RT-600GF |
| Pouch Types | Flat bag, or with optional Hanging hole, Zipper, Spout | |||
| Pouch Size (mm) | 45 (Min.) | 45(Min.) | 50 (Min.) | 90-160(Min.) |
| 180-225(Max.) | 200-280(Max.) | 230-300(Max.) | 320-400 (Max.) | |
| Volume (Max.) | 400ml | 1000ml | 2000ml | 3000ml |
| Speed (bpm) | 20 to 45 | 20 to 45 | 30 to 50 | 20 to 50 |
| Power (kw) | 3.5 | 4.0 | 4.5 | 6.5 |
| Weight (kg) | 1000 | 1500 | 2000 | 2900 |
Work Principle:
Bag Types:
Real Picture in the workshop
Our products includes vertical packing machine,horizontal packing machineandpackage production line and automatic liquid filling production line etc.
Packing EXPO
International stardard wooden box packinage machine
While ROTY team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours..
After Service
ROTY provide free parts and parts delivery, when manufacture defects has been detected during normal operation (vulnerable parts not included) under warranty period.
Training
We will provide free training to your technician free of charge at our factory site in Shanghai, China. The total training period would be 2 working days. All travel and related expensed would be at the purchaser’s expense.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.





