Frigopol Z30-126Y High Pressure Discharge Compressor Reed Valve Kit with Premium Stainless Steel Complete Overhaul Kit
Frigopol Z30-126Y Compressor Reed Valve Kit
The Frigopol Z30-126Y Reed Valve Kit is a comprehensive overhaul set designed for Frigopol Z30-126Y and 30P series commercial refrigeration compressors. This high-pressure rated kit includes the discharge valve plate assembly, suction reed valve, cylinder head gaskets, and all mounting hardware.
Manufactured from premium stainless steel, each component is engineered for the high-pressure demands of Frigopol reciprocating compressors. The complete kit format ensures all wearable valve components are replaced simultaneously for balanced cylinder performance and reliable long-term operation.
Key Features
- High-Pressure Rated: Designed for the elevated discharge pressures of Frigopol compressors
- Complete Overhaul Kit: Discharge plate, suction reed, gaskets, and hardware in one set
- Premium Stainless Steel: Superior fatigue resistance for extended service intervals
- Precision Matched: Components paired for balanced cylinder performance
- Ready to Install: Pre-assembled discharge valve plate reduces installation time
Technical Specifications
| Attribute | Specification |
| Compressor Brand | Frigopol |
| Compatible Models | Z30-126Y, 30P, Z30 Series |
| Valve Type | Discharge Plate + Suction Reed Set |
| Material | Premium Grade Stainless Steel |
| Pressure Class | High Pressure Compatible |
| Kit Contents | Discharge Plate, Suction Reed, Gaskets, Hardware |
Applications
- Commercial refrigeration compressor overhaul
- Supermarket and convenience store refrigeration
- Cold storage warehouse cooling systems
- Food and beverage refrigeration equipment
- Industrial process cooling compressors
FAQ
Q: What is included in this kit versus buying individual parts?
A: This kit includes the discharge valve plate assembly (pre-assembled), suction reed valve, all cylinder head gaskets, O-rings, and mounting screws. It is more cost-effective and ensures all wear components are replaced simultaneously.
Q: Is professional installation required?
A: Installation requires refrigeration service knowledge, including proper gasket preparation, torque specifications, and refrigerant handling. We recommend professional HVAC/R technician installation.
Q: What is the recommended break-in procedure?
A: After installation, run the compressor unloaded for 15 minutes, then gradually increase load over 2 hours. Check for unusual noise or vibration during break-in.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.