Customied Odm Cnc Stainless Steel Parts Machining Turning Milling Service Precision
Customied CNC Machining Turning Milling Stainless Steel Parts Service Precision
Quick details:
1. Keyword: CNC Stainless Steel Parts
2. Process: CNC Machining
3. Color: OEM
4. Place of Origin: Guangdong, China
5. Application: vehicle Accessories
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Equipment: CNC Machining Centers
8. Lead time: 1-2 weeks
Specification:
| Material | Stainless Steel |
| Application | Widely used |
| Color | Silvery |
| Package | Carton Box |
| Surface treatment | Bushing/ Laser engraving/ Etching/ Polishing/ Silkscreen/ Sandblasting etc. |
| Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
| Certificates | ISO9001:2015/ISO13485:2016 |
| Lead time | 1-2 weeks |
Why Choose Us for Custom CNC Machining?
-
Superior Service: Our commitment to great service drives our mission.
-
Quality Assurance: We uphold the obligation to deliver high-quality products.
-
Extensive Experience: We bring years of production and management expertise to every project.
-
Rigorous Quality Control: Our professional testing equipment and strict quality control system ensure top-notch quality.
-
Innovative Design: Our skilled designer team specializes in creating new and unique items.
-
Customization Services: We offer comprehensive OEM & ODM services to meet your specific needs.
CNC Machining Applications
-
Housings and Enclosures: Utilized for precision protection of electronic and industrial equipment.
-
Brackets: Manufactured for mounting and structural support in aerospace, automotive, and machinery applications.
-
Manufacturing Fixtures: Precision fixtures and tooling to aid in the production process.
-
Gears and Bearings: CNC-machined for smooth mechanical operations across various applications.
-
Internal Mechanical Components: Precision fabrication for aerospace and automotive applications.
-
Medical Instrumentation: Critical CNC machining for producing precise and safe medical devices.
FAQ
Q1: Where is your factory?
A1: We are located in Shenzhen, China.
Q2: Can you provide samples before mass production?
A2: Sure, a sample fee is needed, which will be returned when mass production if possible.
Q3: What’s the leading time?
A3: It depends on quantity, generally, 1-2 weeks for samples, and 3-4 weeks for mass production.
Q4: Where can I get product & price information?
A4: Send us an e-mail, and we will contact you as we receive your email.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

