Advanced ETPU E-TPU Product Production Line Machine Precise Control
Price:
negotiation
MOQ:
1
Delivery Time:
6-10days
Brand:
PIN SHENG
Product Description
Material Preparation: TPU pellets or granules are typically loaded into a hopper or feeding system of the molding machine.
Heating: The TPU material is heated to a specific temperature, usually above its melting point, to make it molten and moldable.
Molding: The molten TPU material is injected into a mold or tooling that defines the desired shape and size of the final product. The mold is closed, and pressure may be applied to ensure proper filling and compaction of the material.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
NINGBO PINSHENG MACHINERY CO.,LTD
Location
Lane 299, Guanghua Road, High-tech Zone, Ningbo City, Zhejiang Province
Contact Person
Wang




