NINGBO PINSHENG MACHINERY CO.,LTD
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

Advanced ETPU E-TPU Product Production Line Machine Precise Control

Price Negotiable
Price: negotiation
MOQ: 1
Delivery Time: 6-10days
Brand: PIN SHENG
Product Description
Material Preparation: TPU pellets or granules are typically loaded into a hopper or feeding system of the molding machine.
Heating: The TPU material is heated to a specific temperature, usually above its melting point, to make it molten and moldable.
Molding: The molten TPU material is injected into a mold or tooling that defines the desired shape and size of the final product. The mold is closed, and pressure may be applied to ensure proper filling and compaction of the material.

 

 

 

 


 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company NINGBO PINSHENG MACHINERY CO.,LTD
Location Lane 299, Guanghua Road, High-tech Zone, Ningbo City, Zhejiang Province
Contact Person Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.