Beijing Silk Road Enterprise Management Services Co., Ltd.
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

SGS Mobile Concrete Pump Mini Concrete Pump Machine For Swimming Pool

Price Negotiable
Price: negotiation
MOQ: 1 set
Delivery Time: 3-5 working days
Brand: Silk
Product Description

Portable Design Environmental Mobile Concrete Pump for swimming pool

 

Mobile Concrete Pump

 

PLC automatic control system of Mobile Concrete Pump:
The core components of the electrical part is PLC chip, some important electrical components using imported brands, contactors, relays and button switches and other electrical components, reliable work, simple control circuit, electrical box equipped with switches, remote remote control and receiving control device, can achieve remote control of the equipment, start and stop convenient and fast, It can effectively reduce the waste of slurry in the process of grouting and timely make operation instructions in emergency situations such as pipe blockage, high pressure and failure in the process of grouting, and protect equipment and property losses.

 

Parameter of Mobile Concrete Pump:

Model GS120-1 GS120-2
Number of cylinder 2 2
Material cylinder diameter 120mm 120mm
Air cooler model AH1012T-CA (AC380) AH1012T-CA (AC380)
Type of Gear Pump GJ2050/L GJ2050/L
Rated pressure of gear pump 20 MPa 20 MPa
Maximum outlet pressure 3 MPa 3 MPa
Theoretical discharge 7-9 m³/h 7-9 m³/h
Pump lift 20m 30m
Distance of farthest conveying 40m 60m
Maximum material diameter 20mm 20mm
Tank volume 78 Liter 78 Liter
Dimension size 1895×726×1300 mm 1895×726×1300 mm
Weight 700kg 730kg

 

Working process of Mobile Concrete Pump:

First of all, the concrete pump must be parked on flat, solid ground, absolutely not on soft ground, in order to avoid the inclination in the process of work.

Start the main motor for a short time operation, and observe whether the pressure gauge is normal. According to the length of the pipeline, before starting the construction work, we must first pump the water into the pipeline through the pendulum valve to lubricate the pipe wall. Then mortar, and finally concrete, work begins, and often run the test pump empty, with clear water pumping to confirm the smooth pipeline.

 

Pictures of Mobile Concrete Pump:

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Silk Road Enterprise Management Services Co., Ltd.
Location 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person Felicia Zhou

Request A Quote

Please check your email address.
Your message must be at least 20 characters.