Beijing Silk Road Enterprise Management Services Co., Ltd.
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

Red 11kw Mobile Concrete Pump Foundation Grout Tunnel Construction

Price Negotiable
Price: negotiation
MOQ: 1 set
Delivery Time: 3-5 working days
Brand: Silk
Product Description

Foundation Grout tunnel Construction Mobile Concrete Pump Price compact

 

Mobile Concrete Pump Price

 

Lubrication, cooling, heat dissipation system of Mobile Concrete Pump Price:
The mobile concrete pump is equipped with Y-8 mechanical manual lubricating oil pump, fill 32 mechanical oil, timing manual pressure oil, through THE HT type adjustable oil distributor into 3 channels, respectively to S tube swing valve two rotating shaft diameter with grease, in order to lubricate the sealing parts at the shaft diameter; Before use, "000" grease or cutting fluid should be added to the tank (solid cutting agent and water ratio 1: 50), one end of the tank is connected with the inner cavity of the cylinder, and the other end is connected with the hydraulic cylinder, which can be used for lubrication and cooling of the piston in the cylinder. The tank volume is 78L. After heat balance calculation, AH1012T air cooler can play a good cooling role on the whole hydraulic oil road.

 

Parameter of Mobile Concrete Pump Price:

Model GS120-1 GS120-2
Number of cylinder 2 2
Material cylinder diameter 120mm 120mm
Air cooler model AH1012T-CA (AC380) AH1012T-CA (AC380)
Type of Gear Pump GJ2050/L GJ2050/L
Rated pressure of gear pump 20 MPa 20 MPa
Maximum outlet pressure 3 MPa 3 MPa
Theoretical discharge 7-9 m³/h 7-9 m³/h
Pump lift 20m 30m
Distance of farthest conveying 40m 60m
Maximum material diameter 20mm 20mm
Tank volume 78 Liter 78 Liter
Dimension size 1895×726×1300 mm 1895×726×1300 mm
Weight 700kg 730kg

 

Working process of Mobile Concrete Pump Price:

First of all, the concrete pump must be parked on flat, solid ground, absolutely not on soft ground, in order to avoid the inclination in the process of work.

Start the main motor for a short time operation, and observe whether the pressure gauge is normal. According to the length of the pipeline, before starting the construction work, we must first pump the water into the pipeline through the pendulum valve to lubricate the pipe wall. Then mortar, and finally concrete, work begins, and often run the test pump empty, with clear water pumping to confirm the smooth pipeline.

 

Pictures of Mobile Concrete Pump Price:

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Beijing Silk Road Enterprise Management Services Co., Ltd.
Location 16 Floor, Unit B, Jiatai International Mansion, No 41, Dongsihuan Zhong Road, Chaoyang District, Beijing
Contact Person Felicia Zhou

Request A Quote

Please check your email address.
Your message must be at least 20 characters.