Hebei Hongcheng Pipe Fittings Co., Ltd.
                                                                                                           
Verified Supplier
34 Years
Since 1992
Menu

Cold Rolled Black Paint SCH40 Alloy Steel Seamless Pipe Customized

Price Negotiable
Price: negotiable
MOQ: 1Ton
Delivery Time: 7-15 work days
Brand: HongCheng
Product Description

Product Description:

High Pressure Boiler Steel Pipe is a type of alloy steel pipe made of high-quality seamless steel, which is widely used for gas fire power plant, coal fire power plant, headers and steam lines, feed water pipes, and other applications. It has the advantages of superior material properties, high pressure resistance, and uniform wall thickness, making it ideal for high-pressure boiler applications.

This High Pressure Boiler Steel Pipe is made of seamless steel material for better durability. It is available in different sizes and end protector types, such as plastic pipe caps, beveled, plain, threaded, flanged, etc., to meet different requirements. It also features thin-walled seamless pipe technology, which increases its durability and strength. It is widely used and accepted in gas and coal fire power plant, headers and steam lines, and feed water pipes.

This High Pressure Boiler Steel Pipe is available in various payment terms, including 30%TT Advance + 70% Balance, to ensure customer satisfaction. It is also backed by excellent after-sales service and quality assurance.

 

Features:

  • Product Name: High Pressure Boiler Steel Pipe
  • End Protector: Plastic Pipe Cap
  • Grade: P1, P2,P5,P9,P11,P91,P92
  • Manufacturing Process: Hot Rolled, Cold Drawn, Etc.
  • Material: Alloy
  • Size: Customized
  • Special Feature: Seamless Alloy Steel Pipe
 

Applications:

High Pressure Boiler Steel Pipe provided by HongCheng provides seamless alloy steel pipe and seamless steel pipe to meet the needs of gas fire power plant, coal fire power plant, headers and steam lines, feed water pipes, etc. with ASTM A335 and Astm A179 standards. This high-pressure boiler steel pipe can be customized in size and has various surface treatments such as cold rolling. The minimum order quantity is 1 ton, the price is negotiable, and the delivery time is 7-15 working days. The payment terms are L/C, D/P, T/T, and the supply capacity is 2 million tons per year. The ends of the pipes are beveled, plain, threaded, and flanged. The package is a standard export-worthy package.

 

Customization:

High Pressure Boiler Steel Pipe Customized Service

Brand Name: HongCheng

Place of Origin: China Hebei

Minimum Order Quantity: 1Ton

Price: negotiable

Packaging Details: Standard export seaworthy package,or as required

Delivery Time: 7-15 work days

Payment Terms: L/C, D/P, T/T

Supply Ability: 2 Million Ton/Year

Surface Treatment: Cold Rolled

Manufacturing Process: Hot Rolled, Cold Drawn, Etc.

End Protector: Plastic Pipe Cap

Size: Customized

Material: Alloy

Seamless Alloy Steel Pipe , Seamless Steel Pipe, Alloy Carbon Steel Seamless Pipe, High Pressure Boiler Steel Pipe
 
 

Packing and Shipping:

Packaging and Shipping for High Pressure Boiler Steel Pipe

Our high pressure boiler steel pipes will be securely packaged in wooden cases, pallets or bundles, with all the necessary documents and certificates of quality, quantity and invoices. This type of packaging is designed to protect the product from any damage during transport.

We offer worldwide delivery of our steel pipes. We will also ensure that the products are shipped in accordance with current regulations and laws. All shipments will be secured and tracked, and customers will be able to track the status of their order through our online tracking system.

FAQ:

Q: What is the brand name of high pressure boiler steel pipe?
A: The brand name is HongCheng.
Q: Where is the high pressure boiler steel pipe produced?
A: The high pressure boiler steel pipe is produced in China Hebei.
Q: What is the minimum order quantity for the high pressure boiler steel pipe?
A: The minimum order quantity is 1Ton.
Q: What is the price of the high pressure boiler steel pipe?
A: The price is negotiable.
Q: How long does it take for delivery?
A: It usually takes 7-15 work days for delivery.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hebei Hongcheng Pipe Fittings Co., Ltd.
Location Wuliyao Industrial Zone, Yanshan County, Cangzhou City, Hebei Province, China
Contact Person laura

Request A Quote

Please check your email address.
Your message must be at least 20 characters.