APIE FOUNDATION EQUIPMENT (CHINA)LIMITED
                                                                                                           
Verified Supplier
10 Years
Since 2016
Menu

Rotary Pile Machine with 35kNm Rotary Head Output Torque 12m Drilling Depth and 10° Forward Tilt for Deep Well Construction

Price Negotiable
Price: Negotiable
MOQ: 1 Set
Delivery Time: 20 Days
Brand: APIE
Product Description
Rotary Pile Machine with 35kNm Torque for Deep Well Construction
The Rotary Pile Machine is a highly efficient borehole drilling system engineered for demanding construction applications. This robust equipment delivers exceptional performance for foundation piling, ground stabilization, and deep soil investigation projects, providing contractors with precision and power in pile driving operations.
Key Specifications
Rotary Head Output Torque: 35kNm
Maximum Drilling Depth: 12 meters
Transport Height (without Kelly Bar): 2.9 meters
Rope Diameter: 16mm
Forward Tilt Capability: 10°
Product Features
  • High-performance rotary drilling rig for efficient pile driving
  • Maximum stroke of 1000mm for extended reach
  • Working height up to 6 meters maximum
  • Compact transport width of 2 meters
  • Kelly bar size: 325×6×2.4mm
  • Robust construction ensuring stable and precise drilling operations
  • Suitable for various construction projects and soil conditions
Technical Parameters
Max Stroke 1000mm
Transport Height with Kelly Bar 3.1m
Pressure Force 40kN
Lateral Tilt Angle 15°
Transport Length 4.36m
Lifting Speed 60m/min
Drilling Diameter Range 380-1000mm
Rotary Head Output Torque 35kNm
Maximum Drilling Depth 12m
Transport Width 2m
Applications
The APIE HPR35 Rotary Pile Machine is designed for efficient pile foundation construction across various projects. This advanced piling system is ideal for residential complexes, commercial high-rises, bridges, and infrastructure projects where strong foundations are critical. With a lifting capacity of 45kN and operating weight of 9300kg, the machine handles tough soil conditions and heavy loads in both urban and rural construction sites.
The compact transport dimensions (4.36m length) facilitate easy relocation between job sites, while the precise rotary drilling capabilities ensure minimal disruption to surrounding areas. Delivered securely in wooden crates within 20 days, this machine offers contractors of all scales reliable performance for establishing deep and stable pile foundations.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company APIE FOUNDATION EQUIPMENT (CHINA)LIMITED
Location NO.108-4-1911 HUISHAN AVENUE,HUISHAN ZONE,WUXI CITY, JIANGSU PROVINCE,CHINA 214174
Contact Person Sunny

Request A Quote

Please check your email address.
Your message must be at least 20 characters.