IEC 60112 Comparative Tracking Index Tester 0-600V with 0.5 m³ Stainless Steel Chamber for Insulating Materials
Price:
To be quoted
MOQ:
1
Delivery Time:
20 working days
Brand:
KINGPO
Product Description
Product Overview
The IEC 60112 Comparative Tracking Index Tester is designed for evaluating the tracking resistance performance of solid electrical insulating materials. This professional testing equipment determines material resistance to electrical tracking when exposed to contaminated water under electric field conditions, simulating real-world environmental challenges.
Key Features
- Advanced PLC control system with touch-screen interface
- Precision automatic drip timing mechanism
- Accurate electrode pressure sensor display
- High-quality platinum electrode construction
- Comprehensive safety protection systems
- Stainless steel test chamber with 0.5 m³ working volume
Technical Specifications
| Parameter | Specification | Parameter | Specification |
|---|---|---|---|
| Timing Device | 9999×0.1S Resolution | Drip Interval | Adjustable |
| Electrode Material | Platinum | Drip Height | 30-40mm |
| Electrode Specifications | 5mm×2mm | Drip Delay | 0.2S |
| Electrode Spacing | 4±0.1mm | Drip Size | 45-50 drops/cm³ |
| Electrode Pressure | 1±0.05N | Delay Electric Circuit | 2±0.1S (at 0.5A) |
| Electrode Angle | 60° | Test Voltage Range | 0-600V (Accuracy: 1.5%) |
| Short Circuit Voltage Drop | 8% MAX | Electrical Parameters | 1.5KW/220VAC/50Hz |
| Short-circuit Current | 1±0.1A (Accuracy: 1%) | Working Volume | >0.5 m³ |
| Environmental Requirements | 0-40°C / ≤80% RH | Compliance Standards | IEC60112, UL746A, IEC60695, ASTMD3638 |
Testing Procedure
Setup & Configuration
- Install electrodes and sample properly
- Adjust exhaust fan wind speed
- Configure parameters: Dripping Interval (25S), Dripping Time (5S), Quantity (50-100 drops), Completion Delay (25S), Over-current (0.5A), Over-current Delay (2S)
- Close observation window and press Start button
Test Execution
- Current
- Current ≥0.5A: Test stops after 2S delay with alarm activation
Safety & Maintenance Notes
- Power requirement: 1.5KW, 220V, 50Hz with proper grounding
- Do not open observation window during testing to prevent electric shock
- Activate exhaust fan and clean chamber after testing
- Turn off fan when adding liquid to prevent solution splashing
- Adjust fan speed according to different standard requirements
- Handle platinum electrodes carefully as they are expensive and vulnerable
- Regularly clean dripping system and maintain smooth operation
Product Images
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Kingpo Technology Limited
Location
RM C, 13/F, HARVARD COMMERCIAL BUILDING, 105-111 THOMSON ROAD, WAN CHAI, HK
Contact Person
Lynette Wong