DN400 Ductile Iron Pipe
Price:
$800.00/Tons 1-9 Tons
MOQ:
Negotiable
Delivery Time:
Negotiable
Brand:
yuantai derun
Product Description
China Water Supply Drainage High Quality DN400 DN 300mm Iso90001 Ductile Cast Iron Pipe

Details Images
|
Product
|
Ductile Iron Pipe
|
|
|
|
|||
|
Length
|
6m, cut to 5.7m.In general,
the pipe length is 6m for bulk shipment and 5.7m for container shipment.
|
|
|
|
|||
|
Pipe class
|
K9, K8, C40, C30, C25, etc.
|
|
|
|
|||
|
Standard
|
ISO2531, EN545 , EN598.
|
|
|
|
|||
|
Pipe joint
|
Push-on joint(Tyton joint), K type joint, self-restrained joint
|
|
|
|
|||
|
Material
|
Ductile Cast Iron GGG50
|
|
|
|
|||
|
Pressure
|
PN10, PN16, PN25,PN40
|
|
|
|
|||
|
Internal Coating
|
a). Portland cement mortar lining
|
|
|
|
|||
|
|
b). Sulphate Resistant cement mortar lining
|
|
|
|
|||
|
|
c). High-Aluminum cement mortar lining
|
|
|
|
|||
|
|
d). Fusion bonded epoxy coating
|
|
|
|
|||
|
|
e). Liquid epoxy painting
|
|
|
|
|||
|
|
f). Black bitumen painting
|
|
|
|
|||
|
External Coating
|
a). zinc+bitumen(70microns) painting
|
|
|
|
|||
|
|
b). Fusion bonded epoxy coating
|
|
|
|
|||
|
|
c). Zinc-aluminum alloy +liquid epoxy painting
|
|
|
|
|||
|
Packing
|
Bundled with steel belts or in bulk
|
|
|
|
|||
|
Application
|
Water supply project, drainage, sewage, irrigation, water pipeline.
|
|
|
|
|||















Recommend Products
Product Testing




Certifications





Company Profile




Exhibitation Cooperation
Cooperate with buyers from many countries at the exhibition and discuss cooperation matters in a warm and harmonious manner.

Reception of visiting customers.

Group photo after negotiation with customers

The customer set off to visit the factory.

Customer feedback
After receiving the goods, the customer expressed great satisfaction and thanked us. After this transaction, we have established a long-term friendly cooperative relationship.We believe that sincerity and high quality products can always lead to good cooperation
FAQ
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 2-15 days;
for products need new special and rare materials,usually need 7-15 days to make shipment.
Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.
Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.
Q4. Can you accept customize?
A: Yes. It can be customized as per the customers' request.
Q5. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS.
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 2-15 days;
for products need new special and rare materials,usually need 7-15 days to make shipment.
Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.
Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.
Q4. Can you accept customize?
A: Yes. It can be customized as per the customers' request.
Q5. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS.
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Shandong Xinyongfeng Steel Group Co., Ltd.
Location
North of Luanhe Road, Dongcheng Street, Liaocheng Economic and Technological Development Zone, Shandong Province
Contact Person
Nancy Zhang