Guangzhou Mankun Electronic Co., Ltd.
                                                                                                           
Verified Supplier
21 Years
Since 2005
Menu

Zhaga Book 15 PCB LED Modules With Lens 50W For Street Road

Price Negotiable
Price: Negotiation
MOQ: 1000 Sets
Delivery Time: 5-10 work days
Brand: mankun
Product Description

Zhaga Book15 PCB Led Modules With Lens 50W For Led Street Light Module

 

 

Optical characteristics of LED street light module

 

Model No
MK173-5050-2S12P-AL19976
LED Power
50W 60W
Product size
145*45*10mm
Luminous
8000Lm
Material
PCB aluminum+PC lens
CRI
Ra>85
Warranty
3/5 Years
 

Advantages of LED street light module

1. Patent designs, which means a huge market.

2. We are the manufacturer, we custom-make any design for you.

3. Lifespan 500000hours,3 years warranty, for any quality issue within 3 years, We will accept a refund and a replacement for free.

4. We design and manufacture unique lighting products based on your needs

5. Production time is only about 5 days.

6. Low MOQ, you can order samples to test the quality before bulk orders.

 


FAQ of LED street light module?

Q1:What is the warranty for our lamps?
A1:For the lamps, we have a 3 to 5years warranty.

 

Q2:How do you ensure the quality?
A2: We get three QC processes:

1. For raw materials;

2. During half of production;

3. Final QC test one by one after aging for 12 hours.

 

Q3:How to do if any quality problems on our side in the warranty time?
A3: First, take pictures or videos as proof and send them to us. We will replace new ones for free.

 

Q4:OEM OR ODM accepted?
A4:Yes, we can do OEM & ODM, logos on the light or package both are available.

 

Q5:Can we get support if we have our own market position?
A5:Please inform us of your detailed market demand, and we will discuss and propose helpful suggestions for you, to find the best solution for you.

 

Q6:Is there any cheap shipping cost to import to our country?
A6:For small orders, express will be the best. And for bulk order, the sea ship way is best but take a lot of time. For urgent orders, we suggest via air to the airport.

 

Q7: How many days will the sample be finished? And how about the mass production?
A7: Generally 5-7 days for sample making. The leading time of mass production will depend on the quantity.

 

Q8:What is your trade assurance?
A8:100% product quality protection.
100% product on-time shipment protection.
100% payment protection for your covered amount.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Mankun Electronic Co., Ltd.
Location No.40 Shinan Street,Dawen Village,DongchongTown, Nansha District,Guangzhou City,China
Contact Person Don-Li

Request A Quote

Please check your email address.
Your message must be at least 20 characters.