Hongya Power Generating Equipment To Utilities Limited
                                                                                                           
Verified Supplier
23 Years
Since 2003
Menu

0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

Price Negotiable
Price: 200000
MOQ: 1
Delivery Time: 3 Months
Brand: WaWuShan
Product Description

Stainless Steel Water Turbine Parts Turgo Wheel For Generator

 

The Turgo wheel is basically an improved version of the Pelton.The maximum efficiency of animpulse wheel is achieved when the velocity of the runners at the centerline of the nozzle is half the velocity of the incoming water. To achieve the highest velocities the ratio of the diameter of the wheel and thediameter to the center of the nozzle should be as small as possible..The wheel has a minimum ratio of 9:1, the Turgo has a minimum ratio of 4:1. The Turgo is half the size of the Pelton and operates at twice thespeed. This makes the unit cheaper and reduces the amount of gearingnecessary. The Turgo has an efficiency of over 80% and runs on head of 40 feet or more.

 

specification

 

runner material stainless steel
runner type Kaplan
diameter 0.8 m
capacity 200kw
blade No 18PCS
weight 400KG
 

The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hongya Power Generating Equipment To Utilities Limited
Location Anxi village, Yuping town,Hongya county, China
Contact Person Jack shen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.