Daoyunai Energy Saving Technology Limited
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

Fiber Reinforced UV CIPP Lining cured in place pipe lining equipment uv led curing

Price Negotiable
Price: Variable
MOQ: 60m
Delivery Time: 18 working days
Brand: DAO
Product Description

UV liner for the trenchless repair of underground and municipal sewers pipelines

 

Method for preparation of UV CIPP process

 

Use a CCTV robot to thread a rope to pull the bottom membrane: (use a braided rope, do not replace the rope at will, otherwise, the material or membrane will rotate in the pipe) the connection buckle between the rope head and the bottom membrane should be firmly fastened, and another rope to pull the material should be placed on the upper end of the bottom membrane (if a winch is used, it is a steel wire rope).

 

Ensure that the material and rope are not mixed with the rotation of the bottom membrane during the membrane pulling process. For long-distance materials with large pipe diameters, soapy water can be added to the bottom film to reduce the friction when the material is dragged.

 

 Fixing method  Trenchless
 Method  CIPP
 Length  Any length is possible

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Daoyunai Energy Saving Technology Limited
Location Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city 201616
Contact Person Aaron Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.