Shenzhen Benky Industrial Co., Ltd.
                                                                                                           
Verified Supplier
36 Years
Since 1990
Menu
Fabrication Services Casting Services

ODM aluminium alloy Auto Enclosure Parts die casting New Energy Auto

Price Negotiable
Price: $1.00 - $5.00
MOQ: 5PCS
Delivery Time: 20-25 work days
Brand: Customized
Product Description

OEM ODM Aluminium Alloy Die Casting New Energy Auto Enclosure Parts

 

Customized New Energy Enclosure Parts Auto Aluminum Alloy Die Casting Energy Storage Shell,Pressure Pressure Die Casti

Through more than 30 years of business, we have served nearly every market by successfully delivering precision metal components and products able to meet the most stringent industry requirements.

Packaging & Delivery

Packaging Details

Custom Automobiles Hardware Product Die Casting Auto Parts
Packaging Details:
1. With plastic bag,with pearl-cotton package.
2. To be packed in cartons.
3. Use glues tape to seal cartons.
4. Deliver out by sea or air.
Or according to customers' requirement.
Each carton less than 15kg.

 

Production Capability

 

Mold Material

SKD61, H13

Cavity

Single or multiple

Mold Life Time

50K times

Product Material

1) ADC10, ADC12, A360, A380, A413, A356, LM20, LM24
2) Zinc alloy 3#, 5#, 8#

Surface Treatment

1) Polish, powder coating, lacquer coating, e-coating, sand blast, shot blast, anodine
2) Polish + zinc plating/chrome plating/pearl chrome plating/nickel plating/copper plating

Size

1) According to customers' drawings
2) According to customers' samples

Drawing Format

step, dwg, igs, pdf

Certificates

ISO 9001:2015 & IATF 16949

Payment Term

T/T, L/C, Trade Assurance

 

 

 



 

 

  Our Services Process

1.Quotation: Normally, your inquiry can be quoted within 6 hours as long as we confirm your drawing (IGS, STEP, STL, PDF, DWG etc)and information (Material, Tolerance, Surface Treatment and QTY).
 

2.NDA Signing: With us, your business and money will be safe. So, before cooperation, NDA is avaliable to you.
 

3.Sample Testing: To ensure mass production smoothly, sample need to be tested before production.If products no need moulds, sample can be made within 15 days, fastest 3 days. If need moulds, it normally takes 20-30 days to make moulds and samples.
 

4.Mass Order Production: During production, we can give you updates by pictures and video.
 

5.Assembly&Packaging: We can help you assemble the whole product if you need. Packaging assure to be 100% safe, because we always do packaging test.
 

6.QC System:
1).Checking the raw materials before production;
2).Strictly inspect the processing during production;
3).Testing the half-finished products before surface finishing;
4).Do inspection one by one before delivery. Inspection Report can be provided for u.

 

7.Shipping: by express (DHL, TNT, UPS, FEDEX etc), by air or by sea
 

8.After-sale Service: Once you recieve the goods, please open the packaging and check within 7 days. If there're quality problems with our mistakes, we'll arrange to remake or return money to you. YLD will do the best to meet your satisfaction!

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Shenzhen Benky Industrial Co., Ltd.
Location No.18,Youmagang Industrial Zone, JiangShi Village Gongming Town, Bao'An District Shenzhen City, China
Contact Person Lucy Li

Request A Quote

Please check your email address.
Your message must be at least 20 characters.